User manual
and  attach  to  the  exterior  wall  with  the 
four screws provided. Before attaching 
the vent termination to the exterior wall, 
run  a  bead  of  non-hardening  mastic 
around the edges, so as to  make a seal 
between  the termination  and the  wall. 
The arrow on the vent termination should 
be  pointing  up,  insure  that the  proper 
clearances  to  combustible  materials  are 
maintained.
STEP 5. Before connecting the horizontal run of 
the  vent  pipe  to  the  vent  termination, 
slide the black decorative wall thimble 
cover over the vent pipe.
STEP  6.  Slide  the  appliance  and  vent  assembly 
towards  the  wall,  carefully  inserting  the 
vent  pipe into  the  cap assembly.  It is 
important that the vent pipe extend into 
the vent cap a sufcient distance with a 
minimum of 1” (3.2 cm) overlap. Secure 
the connection between the vent cap pipe 
and  the  vent  cap  by  attaching  the  two 
sheet  metal straps  extending  from  the 
vent cap assembly into the outer wall of 
the  vent  pipe.  Use  the  two  sheet  metal 
screws provided  to connect the straps 
to the vent pipe.  Bend any remaining 
portion  of  the  sheet  metal  straps  back 
towards the  vent cap, so  the  decorative 
wall thimble will conceal it (see left image 
in Figure 18).
STEP 7. Slide  the decorative wall thimble up 
to  the  wall  surface  and  attach  with  the 
screws  provided.  Apply  decorative  brass 
or chrome trim if desired (see right image 
in Figure 18). 
Initial Installation
QUALIFIED INSTALLERS ONLY
Wood screws (x4)
Cut vinyl siding
away to fit standoff
Bolt (x4)
required
Nut (x4)
required
Wood
screw (x4)
Figure 19: Installing Vent Cap with Vinyl Siding Stand-
Off.
Figure 20: Installing Horizontal Vent Termination.
every 36 inches (915 mm). Wall straps are available for this purpose, also when running horizontal pipe 
minimum clearances to combustibles must be maintained; 2 inches (51 mm) at top, 1 inches (38 
mm) at sides, 1 inches (38 mm) at bottom.
STEP 3. With the pipe attached to the stove in the correct location, mark the wall for a 10” (25.4 cm) x 
10” (25.4 cm) square hole (refer to Figure 17). The center of the square hole should match the 
center line of the horizontal pipe. Cut and frame the 10” (25.4 cm) x 10” (25.4 cm) hole in the 
exterior wall where the vent will be terminated. Refer to Figure 8. If the wall being penetrated 
is constructed of non-combustible material i.e. masonry or concrete, a 7 inches (17.8 cm) hole 
is acceptable.
STEP 4. Position the horizontal vent termination in the center of the 10” (25.4 cm) x 10” (25.4 cm) hole, 
18










