Service manual
.,.,.
-,.
d
...,.
.,
(“’
..
:;.,.
...,
.
.
.
.
.
f.
EPL-5600
/ActionLasar
16U0
Sanka
Manual
Dhassamb/y
and
Assambly
3.2.3.2 Power Supply Unit
(PWB-E)
Removal
1.
2.
3.
4.
5.
6.
7.
Open the top cover.
Rerr&ve
the imaging cartridge. Cover the imaging cartridge to protect it
from light or place it in a dark area.
Remove the control panel.
(Re!%r
to Section 3.2.13.)
“
Remove the paper cover.
Remove the right cover. (Refer to Section
3.2.2.l.)
Disconnect connectors
CN1,
CN4, and
CN2
on the power supply board
(PWB-E)
and
CN8
on
engine controller board
(PWB-A).
Disconnect the connectors for the interlock switch.
Remove
2
CP(0)
screws
(M3
x 6), and remove the power supply unit.
PWB-A Board
Figure 3-11. Removing the Power Supply Unit
3.2.3.3
Interlock Switch Removal
1.
~en
the
toP
cover.
Remove
the
ima@g
cartridge.
Cover
the
imaging cartridge to protect it
from light or place it in a dark area.
2. Remove the control panel. (Refer to Section 3.2.13.)
3. Remove the paper cover.
4. Remove the right cover. (Refer to Section 3.2.2.1.)
5. Remove the power supply unit. (Refer to Section 3.2.3.2.)
6. Remove
2 CC
screws
(M3
x 16) for the interlock switch, and remove the interlock switch.
CC
(M3
X 16)
fi
o~
x
II
1
m
Figure
3-12. Removing the Interlock Switch
Rev.
A
3-9