Service manual

EPSON Stylus Photo R280/R285/R290 Revision B
Chapter 4 Disassembly/Assembly 4.4.9 EJ Frame Assy (Disassembling the Printer Mechanism) 80
5. Remove the Ink System in the following procedures.
1.Slide it to the right.
2.Rotate it in the direction of the arrow (1) and release the pump part from
the Main Frame.
3.Pull it out toward you (arrow (2)).
Figure 4-70. Removing the Ink System (2)
4.4.9 EJ Frame Assy
Parts/Components need to be removed in advance
Printer Cover / Paper Support Assy / Upper Housing / Main Board Unit / Panel Assy /
Cover Open Sensor / Printer Mechanism
Removal procedure
1. Move the CR Unit to the home position side.
2. Release the Head FFC from the two hooks of the Cable Holder Frame and pull
out the Head FFC through the cutout.
3. Release the Head FFC from the three hooks of the Front Frame and peel off
the double-sided tape.
Figure 4-72. Removing the Head FFC
When installing the Ink System, be careful of the following:
! Lubrication is required. See the page given below for the
lubrication information.
Lubrication of Ink System (p.117)
! Insert the shafts of the Ink System into the positioning holes
( ) of the Frame.
Figure 4-71. Reinstalling the Ink System (1)
! Tighten the screws in the order given in
Fig.4-68.
! After installing the Ink System, check the Carriage Lock for
proper operation referring to the section given below.
“4.1.8 How to Unlock the Carriage”
! Insert the positioning hole of the Ink System shown in Fig.4-69
over the guide pin of the ASF Unit.
1
2
Pump
Double-sided TapeHead FFC
Acetate Tape Position
[Rear Side]
Hook
Cable Holder Frame
Cutout
Front Frame










