Installation guide
5. General Maintenance 
RC180 Safety and Installation Rev.19 
92 
M
anipulator (S5 series) 
Inspection Point  Inspection Space  Interval 
Check for tram mark misalignment or damage at 
the home position. (Visual) 
Tram mark 
Daily 
Clean the area of motion range for each joint if 
dust or spatter is present.   
Check for damage and outside cracks. (Visual) 
Motion range and Manipulator 
Daily 
Tighten loose bolts. Replace if necessary. 
(Use Spanner, Wrench) 
Base plate mounting bolts   
4 month 
Tighten loose screws. Replace if necessary   
(Use Spanner, Wrench) 
Cover mounting screws   
4 month 
Check for loose connectors. (Manual) Base connectors 
4 month 
Check for proper belt tension and wear.   
(Manual) 
Joint #1 - Joint #6 timing belts 
48 month 
Check for conduction between the main 
connector of base and intermediate connector.   
Check for wear of protective spring.     
(Visual, Multimeter) 
Cable unit   
48 month 
Replace the battery unit when an error warning 
that low battery status is occurring at startup of 
the software or every three years.   
Battery unit   
― 
C
ontroller 
Inspection Point  Inspection Place Daily Monthly Quarterly Biannual Annual 
Check whether unusual 
sound or vibration is 
occurring. 
Entire Controller 
√  √  √  √  √ 
Make a backup of data.  Project and   
system data 
Whenever data is changed.










