Specifications

*300-5629-00*
300-5629-00
WARRANTY:
This Dock Locker is manufactured by Anthro Corporation and has a Lifetime Warranty
against manufacturing defects.
Anthro branded products sold by Ergotron are warranted by the respective manufacturer
which is Anthro Corporation, a wholly owned subsidiary of Ergotron Inc.
Notices:
Anthro reserves the right to modify the design and
specifications without prior notice.
Microsoft and Surface are trademarks of the Microsoft group of companies.
CONGRATULATIONS! YOUR ERGOTRON LOCKER INSTALLATION IS COMPLETE!
While Ergotron, Inc. makes every effort to provide accurate and complete information on the installation and
use of its products, it will not be held liable for any editorial errors or omissions (including those made in the
process of translation from English to another language), or for incidental, special or consequential damages
of any nature resulting from furnishing this instruction and performance of equipment in connection with
this instruction. Ergotron, Inc. reserves the right to make changes in the product design and/or product
documentation without notification to its users. For the most current product information, or to know if this
document is available in languages other than those herein, please contact Ergotron. No part of this publication
may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electrical,
mechanical, photocopying, recording or otherwise without the prior written consent of Ergotron, Inc. 1181
Trapp Road, Eagan, Minnesota, 5521, USA. Patents Pending and Patented U.S. & Foreign. Ergotron is a registered
trademark of Ergotron, Inc.
© 2015 Ergotron, Inc.
STEP 3
INSTALL YOUR DOCK AND SURFACE PRO 3 DEVICE
Close the Locker. Feed the cords through the locker, either through the worksurface and into the bottom of the locker or
through the back of the locker, in this order.
• First, route cord A around the locker to the port on the left side of the dock.
• Next, route cords B and C into the locker and through the left window in front of the spring.
• Now, route cords H and I into the locker and through the right window.
• Finally, route cords D, E, F, and G (USB) into the locker and under the cross piece in front of the spring.
Connect cords to the docking station. Slide the docking station into the locker and gently pull excess cord length out of
the locker. Slide the dock into place in the locker so the front of the dock rests just behind the lockers front lip, and the
dock nests into the indentation in the bottom plate.
Fit your Surface Pro 3 device into the dock. Press the side tabs closed so they fit securely into your device.
Test the fit. First, slowly pull forward on the lock to close the unit. The top grip will slide over the top of the screen, and
the cover will enclose the side tabs.
Next, press the lock button and slowly open the unit. Check that the top grip releases the top of your screen. Check that
the cover releases the side tabs on the dock.
If you are using a security cable, install it now through the port on the top of the cover.
I
G
F
E
D
C
B
A
H
A USB 3.0
B Audio
C Gigabit Ethernet
D USB 3.0
E USB 3.0
F USB 2.0
G USB 2.0
H Mini-display Port
I Power
PORT GUIDE