User's Manual

Performing Concluding Routines
3.
Connect four jumper cables
between the RRU-Ns and the
EHCU.
K000423C
4.
Install the two jumper cables to
the EHCU antenna connectors.
K000423D
Antenna 1
EHCU
Antenna 2
A
B
C
D
C+D
A+B
6 Performing Concluding Routines
This chapter describes the routines to be completed before leaving the site.
Note: Ericsson strongly advises that when cleaning up after installing the
RBS, the personnel performing the installation pay particular attention
to the environment. Primarily, recycle all waste materials that can be
recycled and sort waste so that it can be disposed of according to local
regulations.
27
50/1531-LZA 701 0001 Uen PA4 2008-07-31