User's Manual

RBS Installation Instructions
Table 2 Objects to Be Recycled or Disposed of After RBS Installation
Item
Sort or Recycle?
Cable insulation from
crimping, brazing or
welding
Packing chips
Foam
Polystyrene
Bubble plastic
Cable tie clippings
Sorted with plastics
Paper and wood Paper recycling
Waste metal from cable
ladders
Pieces of cable
Nuts, bolts, washers and
screws
Recycled or sorted as metals
Note: All packing material should be recycled, and shock absorbers disposed
of, in accordance with local recycling regulations.
6.1 Updating the Site Installation Documentation
Note: Any deviations from the information in the Site Installation
Documentation that have occurred during the installation phase (for
example, floor plans or site configurations) must be documented and
sent to the person responsible for Site Installation Engineering.
1. Check the Site Installation Documentation for deviations from the
installation.
2. Update the documents with the changes that apply.
3. Send the documents to the person responsible for Site Installation
Engineering.
6.2 Performing Final Checks
Before leaving the site, make sure that the following tasks have been completed:
Table 3 Checklist
Check the following: OK
1.
All cables are properly routed and connected.
2.
All sunshields are properly installed.
28 50/1531-LZA 701 0001 Uen PA4 2008-07-31