- 3 Installation RRU-N
- Introduction
- Target Group
- 3.1 Preconditions
- 3.2 Installation Procedure
- Figure 1 Workflow for Installing the RRU-N
- 3.2.1 Unpacking and Checking the Material
- 3.2.2 Installing RRU-N on a Pole or a Mast
- 3.2.3 Installing RRU-N on a Wall
- 3.2.4 Grounding RRU-N
- 3.2.5 Connecting the 48 V DC Power
- 3.2.6 Connecting Optical Fiber Cable and Setting RRU-N Configura
- 3.2.7 Connecting Antenna Cables
- 3.2.8 Installing the Front Sunshield
- 4 Optional Installation External Splitter/Highway Function
- 5 Optional Installation External Hybrid Combining Unit (EHCU)
- 6 Performing Concluding Routines
- 7 Verifying the Installation
- tables
Tools and Documentation
1 Introduction
This chapter describes the installation of the RRU-N Second Generation, and
the connection of the RRU-N to other existing site products.
The RRU-N Second Generation consists of the following RRUs:
• RRUN8-22
• RRUN9P-22
• RRUN9E-22
• RRUN18-22
• RRUN19-22
2 Tools and Documentation
This chapter contains lists of all tools and instruments recommended for the
complete installation of the RRU-N.
2.1 Tools for Installation of RRU-N
The tools required for the installation of RRU-N are shown in the table below.
Table 1 Tools Required
Product Name Description Product Number
Tool set, Installation
Tools
Personal tools LTT 601 135/1
Tool set Crimping tool for
grounding
LTT 601 86
230 V AC LTT 601 146/1Hammer drill
or
Cordless hammer drill
Cordless 230 V AC LTT 601 147/1
Torque wrench for N connectors LSS 103 25/1