• Searching for sites and obtaining a site appraisal
• Outlining the site design and evaluating the cost
• Negotiating and signing leasing c ontracts
• Handling permits and arranging a handover to the Engineering personnel
Civil Works
The Civil W orks process is performed in close cooperation with the Site
Acquisition process and the Engineering process.
The Civil Works process consists of the following activities:
• Preparing a detailed civil works design of the site
• Updating the costs for the site construction
• Arranging the site construction
• Performing a site inspection and handing over an as-built document to
the Engineering personnel
Engineering
The Engineering process begins when the Site Acquisition and Civil Works
processes are complete.
The Engineering process consists of the following activities:
• Measuring and collecting information about sites
• Designing the antenna and radio configuration, and producing cable
drawings
• Making drawings showing the positions of the antenna and RBS equipment
• Defining areas of responsibility between the purchaser and the contractor
• Producing site-specific information in the Site Installation Documentation.
For more information about the results from the site engineering process, see:
Site Engineering Instruction
LZN 901 0602
Installation and Integration
The work involved in this process is performed by installation personnel, and
test and integration personnel.