User's Manual Part 2

RBS 2308 and RBS 2309 User’s Guide
Table 17 Checklist
Check the following: OK
1. All cables are properly routed and connected.
2. All sunshields are properly installed.
3.
The site is clear of waste m aterials.
4.
The Site In s ta llation Do cu men
tation is updated.
5.
The modified Site Installation Documentation has been handed over
to the person responsible for the site.
6.
The RBS is powered up if the surrounding temperature changes
between hot and cold and the R BS installation is not completed
within 48 hours.
(1)
(1)SeeChapterSiteInsta
llation Tests.
5.5 Installing Mixed Micro Configurations
5.5.1 General
Mixed micro means that an existing RBS 2302 site is expanded by adding
one or more RBS 2308s or RBS 2309s. In all mixed micro configurations, the
RBS 2308 or RBS 2309 must serve as the master.
A maximum of two RBS 2302 cabinets can be connected to an RBS 2308 or
RBS 2309. In an existing configuration of s ix TRXs, one RBS 2302 cabinet
mustberemoved. ThetworemainingTRXsofTRX0–5intheRBS2302
group will change their numbering to 8 11. See figures below.
Figure 33 3×4 Configuration with EDGE Capability in All Cells
8
5
EN
/LZT 720 0027 Uen R8A 2006-06-27