User's Manual Part 2

RBS 2308 and RBS 2309 User’s Guide
5. If the Local indicator on the RRU or IXU does not have the correct status,
press the Local/Remote button to switch status.
6. If RBS site integration is not performed immediately after site installation
tests, then close the sunshields.
7.9.3 Completing the Test Record
This section contains a test record. It is recommended to fill in the test record
during the testing procedure.
1
45
EN
/LZT 720 0027 Uen R8A 2006-06-27