User's Manual Part 2

RBS 2308 and RBS 2309 User’s Guide
5.
Wait for the BSC operator to confirm that the Abis Paths are correctly
defined and that the Digital Path between the BSC and the RBS is
working properly.
6.
Repeat steps 2 to
5 for all used PCM lines.
7.
Enter Pass/Fail in the test record, see Section 9.4.2 Filling i n the Test
Record on page 171.
9.1.2 Transmission Test on T1
This section describes how to test transmission, when the T1 transmission
interface is used.
Note: Transmission test on T1 c an also be performed in the same way as E1,
according to Section 9.1.1 on page 163.
1. Request that the BSC operator uses CSU functions.
2. Configure the RBS for CSU
, using OMT, and restart the RBS.
For more information regarding CSU ANSI, see:
BSS R11 Software Reference Manual EN/LZT 720 0047
1. Wait for the BSC to check the Digital Path on the active RBLT.
2. Deactivate CSU functions in the RBS, using OMT and restart the RBS.
3. Wait for the BSC operator to check that the Abis Paths are correctly defined
and that the Digital Path between the BSC and the RBS works properly.
4. Enter Pass/Fail in the test record, see Section 9.4.2 Filling in the Test
Record on page 171.
9.2 Bringing the RBS into Service
This section describes how to bring the RBS into service.
Note: The BSC operator can bring the MOs into service and deblock them
even when the RBS is in remote mode. (The RBS then responds
directly to the BSC operator.)
Note: Do not touch the RBS when any indicato
rs are double-flashing. See
section Double-Flash Indication of Funct
ion Changes in chapter
Maintenance.
1. Set the RBS in local mode by pressing the Local/remote button on the IXU.
164
EN/LZT 720 0027 Uen R8A 2006-06-27