User's Manual Part 2

RBS 2308 and RBS 2309 User’s Guide
5. Monitor the signal strength (RxLev) and move through the cells to verify that
handover takes place between cells at the cell borders. See figure below.
P010289A
TEMS
Figure 69 Verifying that Handover Takes Place at the Cell Borders
6. Write “Pass” or “Fail” in the test record. See Section 9.4.2 Filling in the
Test Record on page 171.
7. Terminate the call and stop the log.
9.4 Performing Concluding Routines
This section describes the actions to be taken before leaving the site, and the
test record to be completed during the tests.
9.4.1 Checking the RRU, IXU, a nd PSTU (Optional) Indicators
This section describes how to check that the RRU, IXU, and PSTU (optional)
indicators show the correct status, when the RBS is connected to the BSC and
is fully operational. The check should be performed before leaving the site.
1. Check that the indicators on the RRU(s), IXU, and PSTU (optional) have
the status shown in the tables below:
1
69
EN
/LZT 720 0027 Uen R8A 2006-06-27