Installation Instructions
Table Of Contents
- Commissioning Procedure
- 1 General
- 2 Hardware Commissioning
- 3 Part A - Installation Inspection
- 4 Part B - Power Test
- 5 Part C - Transmitter Test
- 6 Part D- Hardware Alarms
- 7 Part E- LED indicators
- 8 Before Leaving the Site
- 9 Software Commissioning
- 10 Commissioning Procedure
- 11 Before Leaving the Site
- Appendix 1 Downloading New MAIN NTE SW to a BRU1 Node
20 (23) BRU1 MANUAL
BRU1 MANUAL, Doc.no: b1commis Uen Rev PA5, 2004-02-20
Note the information in the Commissioning Test Record.
10.2 Part SW-B - Network Test
SW-A6. For the unit, enter the NODOP command <LIST PORTS>.
For the port, enter the command <SHOW PORT>.
For the port, enter the NODOP command <LIST CHANNELS>.
For every channel listed, enter the command
<SHOW CHANNEL>.
Enter the NODOP command <LIST CONNECTIONS>.
For every connection listed, enter the command
<SHOW CONNECTION>.
SW-B1. Use the NODOP command <SHOW TIME> and verify that the
base has received the correct system time. Set the time, if
necessary using the <SET TIME> command. Make a note of the
test results in the Commissioning Test Record.
SW-B2. Use the command <SHOW DELTA TIME> and verify that the
node has received the correct delta time. Set the time, if necessary,
using the <SET DELTA TIME> command. Make a note of the
test results in the Commissioning Test Record.
Use the NODOP command <LOGOUT> to terminate the
NODOP session.