Installation Guide
3. Make sure frame is level.
Screw the frame to the opening.
4. Cover hole with plastic cap.
2. Drill 7/16 hole into first layer of
Side frames for cap and ¼” hole on
the other layers.
• Side needs 4-5 Screws ( 6” from bottom ,
6” from top and other screws spaced
equally along the frame).
• Top track needs 2-3 screws spaced
equally along the top piece.
Frame Installation
1. Apply the Liquid Nail under the track and place the frame in the
opening.
• Only Liquid Nail is recommended for bottom track for better waterproofing unless floor is
not level and you will need to anchor the track to the floor.