2089 Anchor Ct. Newbury Park, CA 91320 www.erishomeproducts.com info@erishomeproducts.com Office: 805.375.
Frame Assembly 3. Tighten the brackets screws equally until there is no gap between frames. 1. Find the correct frame pieces. Matching each letter to corresponding one: 2. Insert the brackets into the frame and make sure the pin gets into the hole. 4. For low bottom track, use the longer screws that came with frame and screw from behind the side pieces into the bottom track.
Frame Installation 1. Apply the Liquid Nail under the track and place the frame in the opening. • Only Liquid Nail is recommended for bottom track for better waterproofing unless floor is not level and you will need to anchor the track to the floor. 2. Drill 7/16 hole into first layer of Side frames for cap and ¼” hole on the other layers. • • Side needs 4-5 Screws ( 6” from bottom , 6” from top and other screws spaced equally along the frame).
Door Panels Installation 1. Find and install the first folding panel. • • • Usually, panels have labels and panel #1 is the first panel. If the label is missing the one with 3 small holes on one side is the first panel Use the 1” screws for hinges attaching to the frame. When the door is closed holes in picture below must be inside. 2. Install bottom wheel and top guide to second panel. • • If the label is missing the panel that has D shape handle on it is the second panel.
3. Place the second panel on the track and top guide in the frame. Bottom Wheel Top Guide 4. Connect the second panel to the first panel. • Use 2” screws for attaching hinges to the door panels.
5. Connect the third panel to the second panel. • • • For 3 panel doors: third panel is labeled #3 or its the one with holes for main handle and lock. Skip step 6. Use the 2” screws for attaching hinges to the door panels. For 4 panel doors : third panel is labeled #3 or its the one with small lock on side of the door as shown here. 6. Install the panel #4 to the other side of frame. • • Fourth panel is the panel with holes for main handle and lock. Use the 1” screws for attaching hinges to the frame.
Hardware installation 1. Install the main handles to the main panel and small handle to the first folding . • Main lock is 3-point lock, in order to lock the door, pull up the handle, latches will engage and with turning the knob you can disable the handle. Turning the knob by itself will not engage the latches. 2(Optional). Install door magnet or grab catch door holder: • • Door holder is optional and there is no predrilled hole for it, it will be installed between last two folding panels.
FULLY ASSEMBLED PRODUCT For additional information or questions please contact us 2089 Anchor Ct. Newbury Park, CA 91320 www.erishomeproducts.com info@erishomeproducts.com Office: 805.375.