Service manual
B
A C D E F G SERVICE
20
Fit the Horizontal Powerue Wall Terminal into the hole and x in place, making sure the
installation is sealed appropriately to prevent the ingress of water from outside the wall
cladding.
NOTE: It is the responsibility of the installer to ensure the Horizontal Powerue Wall
Terminal is installed to all relevant building codes to ensure weather tightness. This may
nesesitate the use of appropriate ashing material where appropriate.
IMPORTANT: Ensure that ashings do not restrict the air intake slot around the periphery
of the cowl
D5 Vertical Power Flue
The Vertically terminated ue kit is intended for use within an accesable roof space or
accesable ‘chimney’ construction. Service access must be provided.
Ensure installation complies with relevant building codes and regulations.
To appliance
Typical Installation Vertical High Wind Terminal
‘Decktite’ or similar flashing
Ø203mm / 8” Co-axial Flue
Hose band clamps
Ø75mmØ100mm
Ensure Power Flue unit
is securely braced using
integral brackets.
Roof Space
Power cord to
appliance










