Service manual
B
ACDEFGSERVICE
41
G
Installation Checklist
Go through the following checklist to ensure you have installed the appliance correctly
□ Correctly sized cavity to suit your fascia and ue conguration
□ Correct clearances to combustibles and mantles around the fascia
□ An electrical isolating switch to the appliance, accessible after nished installation
□ Correctly sized gas supply with a pressure test point, ensuring adequate supply with
all other gas appliances in the dwelling running
□ A weather-tight installed Horizontal or Vertical Powerue Terminal with clearance as
specied by AS/NZ5601
□ Reasonable access to the outside face of the Horizontal Powerue Wall Terminal for
maintenance purposes OR
□ Access to the Vertical Power Flue Enclosure for maintenance purpose
□ Flue attached to the rear/bottom of the Powerue Terminal leading back to the appli-
ance
□ The electrical cable from the Powerue Terminal attached to the rear of the installa-
tion and run back to the appliance cavity in an electrically safe manner
□ The appliance xed to the cavity base and wall lining
□ The appliance plugged into a mains electricity supply
□ All gas joints and pressure points leak tested, and soapy water and drop tests com-
pleted on gas pipework
□ Gas type conversion process carried out if required
□ Log, coal, river stone or crystalight fuel bed correctly installed
□ Glass correctly tted
□ A completely tted fascia
□ The remote control mounted on its cradle on a wall
□ Operated the re and veried that it lights reliably and safely
□ Run the appliance on full for an hour with the doors & windows open
□ Appliance functions checked, including thermostat operation, Flame Eect and Fan
Boost
□ Dwelling owner shown how to operate the appliance correctly
□ Warranty card lled in with installer details and appliance serial number
□ User Guide made available for end user
□ Plumbing Industry Commission Compliance Certicate given to end user










