Installation manual

630162_5EF5000InstallationGuideRemotion‐US
11.0 Connecting the power supply and Touch panel:
11.1 The Touch Panel and Power Isolating Switch are located in the RH side of the Fascia.
11.2 The Touch Panel socket and Isolating Switch socket plugs into the 5 pin plug lead situated
at the front RH side of the fire. Push them together until they ‘click’,
12.0 Testing of the Touch panel and spark ignition:
IMPORTANT: Before the operating pressure can be checked and the fascia fitted,
The touch panel and spark ignition must be tested.
12.1 This can be done with the gas supply either turned on or off.
With the power supply and touch panel connected, Lean the fascia Right end up beside the
fire and run through the steps for igniting the pilot (refer to section 17.0 for instructions).