Technical data

Flow Meter FC01-Ex Flow Meter FC01-Ex
8 Ex atmosphere - Definitions and mounting instructions 8 Ex atmosphere - Definitions and mounting instructions
2.6.1.2.1 Liquid media
In the case of vertical pipelines the monitoring head should be installed where the flow is
rising, if possible.
For horizontal pipelines the monitoring head should be mounted on the underside of the
line (suspended).
The monitoring head should be installed only in a straight section of piping. There should
be a distance of at least 20 pipe diameters before the monitoring head, and 5 pipe diam-
eters after the monitoring head before or after bends and changes in pipe diameter, to
avoid any effects of turbulence (fig. 3).
Flow past the sensor should be from the side marked with a green dot.
2.6.1.2.2 Gases
If gases are to be monitored, the mounting attitude of the monitoring head is unimportant in either
vertical or horizontal pipelines. There should be a distance of at least 20 pipe diameters before the
monitoring head, and 5 pipe diameters after the monitoring head before or after bends and
changes in pipe diameter, to avoid any effects of turbulence (fig. 3).
2.6.1.2.1 Liquid media
In the case of vertical pipelines the monitoring head should be installed where the flow is
rising, if possible.
For horizontal pipelines the monitoring head should be mounted on the underside of the
line (suspended).
The monitoring head should be installed only in a straight section of piping. There should
be a distance of at least 20 pipe diameters before the monitoring head, and 5 pipe diam-
eters after the monitoring head before or after bends and changes in pipe diameter, to
avoid any effects of turbulence (fig. 3).
Flow past the sensor should be from the side marked with a green dot.
2.6.1.2.2 Gases
If gases are to be monitored, the mounting attitude of the monitoring head is unimportant in either
vertical or horizontal pipelines. There should be a distance of at least 20 pipe diameters before the
monitoring head, and 5 pipe diameters after the monitoring head before or after bends and
changes in pipe diameter, to avoid any effects of turbulence (fig. 3).
D = nominal pipe diameter
D = nominal pipe diameter
D
20 x D 5 x D
5 x D
D
20 x D
fig. 3
D = nominal pipe diameter
D = nominal pipe diameter
D
20 x D 5 x D
5 x D
D
20 x D
fig. 3