Operation Manual
33
EN
Getting started
After installation, wait 2-4 weeks
before starting the underoor heating.
Precisely how long you wait depends
on the type of oor you have and the
instructions for the oor ller. Then
increase the heat gradually. This does
not apply to those who have laid a
wooden/laminate oor on the oor
heating.
There is a quick guide that helps you to
get started easily with the thermostat.
You will nd it in the package. The
guide describes the most important
functions and settings.
In order to adapt the underoor
heating system to your own heating
requirements as much as possible, it
is important that you read the entire
manual.










