Instructions / Assembly

6
Installation (continued)
7
Connecting to the Power Source
Connect the hot and neutral (black and white) solid copper
jumper wires (AA) to the same color wires from the electrical
source.
Cover the wire connections using the wire connectors (not
included).
Wrap the wire connectors (not included) with electrical tape
for a more secure connection.
8
Replacing the Ballast Cover
Replace the ballast cover, if necessary.
9
Installing LED Tubes
Install LED tubes (A) with the end labeled “power this
end” to the wired sockets.
Turn the tube a quarter turn to lock it in place.
Affix the UL Safety Sticker (BB) in a visible location.
10
Adjusting the Color Temperature
of the Light
This LED Tube allows you to customize the color temperature of
the light output.
Move the toggle switch on the side of the end cap to
make your selection.
CCT Setting #1 / CCT Setting #2
B
A
AA
AA
B
Wire
Connectors