Operation Manual
Instruction for use Nova Instant HC
13
© ETNA Coffee Technologies b.v.
COFFEE TECHNOLOGIES
2.4 Principle of operation
☞
LEDs above the cup stand indicate where a cup must be
placed; on the left or right on the cup stand.
After a selection is made, the machine mixes water with the ingredients
from the containers to dispense the drink.
• The water is supplied via the boiler (heated).
• Instant products are dosed from the containers into the mixer and/or
the ground coffee is dosed from the grinder into the brewing group.
• The water and the ingredients are mixed in the mixer or
compressed by the brewing group.
• The drink is dispensed through the dispensing pipe into the cup
placed on the cup stand.
• The cup stand has two sides; water on the left, drinks on the right.
2.5 Switching ON and OFF
• I pressed in = ON (switch lights up)
• 0 pressed in = OFF
Figure 2-4
Figure 2-5