Installation Manual
![](/manual/eucast/ecl2248-2723/installation-manual-english/images/img-11.png)
- xi -
EUCAST Co. Ltd. All rights Reserved
= CONFIDENTIAL =
2.2 Survey of installation area
174
Installer must survey install area before installation
175
To investigate the site, You prepare drawing of the place where the system is installed, and carry
176
out preliminary inspection on the following matters
177
⚫ installation space and work space
178
⚫ Check the route and method of transporting the system to the installation location
179
⚫ Direction of equipment installation
180
⚫ Installation status of lighting equipment
181
⚫ External interface situation
182
⚫ Electrical capacity and wiring situation
183
⚫ Status of System Expansion
184
⚫ Location and wiring method of RF antenna and GPS antenna
185
⚫ Environment that affect safety of installer
186
⚫ Packaging waste disposal facility
187
188
2.3 Movement of equipment
189
When transporting carton box and materials, must be transported according to the method which
190
be displayed on packaging. Specially when it is displayed in the top and bottom, do not carry in
191
the reverse. It is necessary to minimize the occurrence of physical shocks during transportation.
192
193