Installation Manual

- xi -
EUCAST Co. Ltd. All rights Reserved
= CONFIDENTIAL =
2.2 Survey of installation area
174
Installer must survey install area before installation
175
To investigate the site, You prepare drawing of the place where the system is installed, and carry
176
out preliminary inspection on the following matters
177
installation space and work space
178
Check the route and method of transporting the system to the installation location
179
Direction of equipment installation
180
Installation status of lighting equipment
181
External interface situation
182
Electrical capacity and wiring situation
183
Status of System Expansion
184
Location and wiring method of RF antenna and GPS antenna
185
Environment that affect safety of installer
186
Packaging waste disposal facility
187
188
2.3 Movement of equipment
189
When transporting carton box and materials, must be transported according to the method which
190
be displayed on packaging. Specially when it is displayed in the top and bottom, do not carry in
191
the reverse. It is necessary to minimize the occurrence of physical shocks during transportation.
192
193