Product Manual

INSTALLATION
WALL DRILLING AND BRACKET FIXING
As a first step, proceed with the following drawings:
A vertical line up to the ceiling or up to the upper limit, at the center of the area in which the
hood is to be fitted.
A horizontal line A at 920-1020 mm above the cooker top.
A horizontal line B at a X mm above the horizontal line A.
A horizontal line C at a 190mm below the horizontal line A.
Mark Points:
Mark a point (1) on the horizontal line A, 80 mm to the vertical reference line.
Repeat this operation on the other side and on the vertical reference line , checking that
the three marks are leveled.
Mark a point (2) on the horizontal line B, 40 mm to the vertical reference line.
Repeat this operation on the other side , checking that the two marks are leveled.
Option Chimney X
1
400+0
/
2
400+300 390-620
3
400+390 390-710
Mark a point (3) on the horizontal line C, 170 mm to the vertical reference line.
Repeat this operation on the other side , checking that the two marks are leveled.
40
B
(2)
40
80 80
A
(1)
170 170
C
(3)
Vertical reference line
920-1020
X
190
4
500+490 490-910
5