User manual

00048182.DOC, Version 1.0
18/25
1
2
4
5
6
7
8
9
Powersupply:
230V AC50Hz~
PowerOut
3
OVERVIEW (Example: EUROLITE LED Flood Light PIX-24 RGB)
INSTALLATION
Overhead rigging
The installation of the device has to be built and constructed in a way that it can hold 10 times the weight for
1 hour without any harming deformation.
The installation must always be secured with a secondary safety attachment, e.g. an appropriate catch net.
This secondary safety attachment must be constructed in a way that no part of the installation can fall down
if the main attachment fails.
When rigging, derigging or servicing the device staying in the area below the installation place, on bridges,
under high working places and other endangered areas is forbidden.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert before taking into operation for the first time and after changes before taking into operation another
time.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert after every four year in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are approved by a
skilled person once a year.
Procedure:
The device should be installed outside areas where persons may walk by or be seated.
IMPORTANT! OVERHEAD RIGGING REQUIRES EXTENSIVE EXPERIENCE, including (but not limited to)
calculating working load limits, installation material being used, and periodic safety inspection of all
installation material and the device. If you lack these qualifications, do not attempt the installation yourself,
1. Mou nting brac k et
2. Saf ety r ope
3. Fus e
4. Po wer suppl y
5. Po wer Out
6. DMX IN
7. DMX OUT
8. LC displ ay
9. Progr amm ing ke ys