Installation, Operation and Maintenance Manual DV 42 ST See-through Gas Fireplace Check local codes and read all instructions prior to installation. Warning: Improper installation, adjustment, alteration, service or maintenance can cause injury or property damage. Refer to this manual. For assistance or additional information consult a qualified installer, service agency or the gas supplier.
DV 42 ST See-through Gas Fireplace Warning: Read this manual before installing, operating or troubleshooting this appliance. Please retain this owner's manual for future reference. Congratulations Congratulations on selecting a European Home gas fireplace, an elegant and well designed gas fireplace built with you in mind. The gas fireplace you have selected is designed to provide the utmost in safety and reliability.
DV 42 ST See-through Gas Fireplace Introduction Thank you for choosing a European Home Gas Fireplace. About this Fireplace: X X 34,000 DV 42 ST E X X 34,000 Standard Pilot Ignition Electronic Ignition Gas Rating (BTU/hr) DV 42 ST MODEL Natural Gas Liquid Propane The DV 42 ST (See-thru) is a fireplace with a linear-style burner. This fireplace can be converted to both a Top Vent or Rear Vent application, and is available in the models below.
DV 42 ST See-through Gas Fireplace Installation Supplied shield Combustible Shelf Frame in the enclosure for the unit with framing materials. The framed opening for the assembled fireplace is 45" wide, x 40" high x 23 3/4" deep, see Figure 2. 2” Min. N.G. & L.P NOTE: When constructing the framed opening, please ensure there is access to install the gas line when the unit is installed. See Figure 22. 21” Min. PEL Short 90 elbow 45" Both walls Typical. May not be exactly as shown.
DV 42 ST See-through Gas Fireplace Installation Vent Installation Gas Installation FUEL CONVERSION This section covers the installation of direct venting and terminations. Verify that your fireplace is compatible with your available gas type. If gas type is not compatible, contact your local European Home representative to purchase a conversion kit. Conversion kits must be installed by a qualified service technician.
DV 42 ST See-through Gas Fireplace Installation Installing Terminations with Built-In Frames Installing Heat Guards over Terminations 11 PTO-4 (5"/8") 11 PTKOG (5"/8") Figure 5a. Installing a PTO termination. Figure 5d. Installing a PTO termination heat guard. 1. Frame the termination opening to 11" x 11". 2. Fasten the termination to the studs using a minimum of 4 screws. Installing Terminations with MSR Frames 12 MSR 1.
DV 42 ST See-through Gas Fireplace Installation Top Vent Venting Runs 1 MIN 1 MIN. Both sides Typical Example A: (Unacceptable Installation N.G. and L.P.) If the vertical dimension from the hearth is 108" and the horizontal run to the wall flange of the vent termination is 180", this would not be an acceptable installation. RHS8 Heat Shield Example B: (Acceptable Installation N.G. and L.P.
DV 42 ST See-through Gas Fireplace Installation Note: Flame characteristics will change if the maximum vent height is used. A maximum of two offsets (each offset has two 90° bends) may be made and shall not exceed total length of 25% of the vertical vent height, when measured center to center of piping. Example: Typical vent installation. 20' vertical vent 2 - 2' offsets required 25% of 20' = 5' max. offset allowed This venting configuration meets requirements.
DV 42 ST See-through Gas Fireplace Installation Side Vent Venting Requirements The DV 42 ST can ONLY be rear vented as shown in Figure 15, 16, 17, 17a, 17b. The vent MUST exit the fireplace using a 90 degree elbow and run vertically through the roof, etc. Short Configurations: For installations straight through the wall, use an PTO-4/-4F termination and PXT5 or PXT-10 to achieve the desired length. The maximum horizontal vent run with no vertical lift is 12". See Figure 16.
DV 42 ST See-through Gas Fireplace Installation Vertical Vent Installations Vertical vent Installations. • minimum 2' (two feet) above the highest point where vent passes through the roof. • minimum 6' (six feet) from a mechanical air inlet • minimum 18" (11/2 feet) from a parapet wall. PEXT Solid Section Maximum vent height is 32 feet above fireplace. Note: Flame characteristics will change if the maximum vent height is used.
DV 42 ST See-through Gas Fireplace Installation Reduced Vertical Installation (Available with Linear LDVPV47 Power Vent ONLY) It is possible to reduce vertical vent runs from 5"/8" venting to 4"/7" venting. Reduced vertical venting may only be used when the Linear (In-line) Power Vent is required. This is commonly due to longer than normal vent runs, or unusually long horizontal Vent runs.
DV 42 ST See-through Gas Fireplace Installation Wiring Mantels and Surrounds NOTE: National Canadian Gas Association mantel test requirements are for fire hazard prevention to combustible materials. New technology, to meet consumer and government demands for the wise use of energy, has prompted us to manufacture many models of fireplaces which are hot, fuel and energy efficient.
DV 42 ST See-through Gas Fireplace Installation DV 42 ST Removing and Installing the Doors Removing the doors The doors are removed in a few simple steps. Follow these steps below to remove the horizontal access panel, unlatch the door buckles and, remove the door. Replace in reverse order. Step 1: Remove the Horizontal Access Panel Remove the horizontal cover by placing fingers in both finger holes, then pushing away from you and lifting out. Place it aside during maintenance or cleaning.
DV 42 ST See-through Gas Fireplace DV 42 ST Installation Installing the Glass Beads and Optional Fire Media The DV 42 ST fireplace is supplied with glass beads. Optional stone and driftwood fire media are available. Remove the door and trim as shown previously. Follow these instructions to ensure all parts are removed or replaced as required. Once the trim and glass doors are removed place the glass beads AROUND the burner.
DV 42 ST See-through Gas Fireplace Operation - Model DV 42 ST DV 42 ST with Continuous Pilot For Your Safety - READ BEFORE LIGHTING: WARNING: If you do not follow these instructions exactly, a fire or explosion may result causing property damage, personal injury or loss of life. A. This appliance has a pilot which must be lighted by hand. When lighting the pilot, follow these instructions exactly. B. BEFORE LIGHTING smell all around the appliance area for gas.
DV 42 ST See-through Gas Fireplace Operation - Model DV 42 ST E DV 42 ST E with Proflame SIT Electronic Ignition For Your Safety -Flame READElectronic BEFORE LIGHTING: with American Ignition WARNING: If you do not follow these instructions exactly, a fire or explosion may result causing property damage, personal injury or loss of life. A. This appliance is equipped with an ignition system that lights the pilot burner automatically. Do not attempt to light the pilot by hand. B.
DV 42 ST See-through Gas Fireplace Operation Maintenance Lighting Instructions General See pages 15 and 16. QQ Burner Adjustment Have the fireplace and installation inspected yearly. The inspection must include, but is not limited to, the following: The DV 42 ST is equipped with an adjustable burner, allowing you to raise or lower the flames. To adjust the flames, locate the black knob marked 'Hi-Lo', in the center of the gas control valve (See Figure 32). The front burners are not adjustable.
DV 42 ST See-through Gas Fireplace Maintenance Gas Control Valve DV 42 ST Power Generator Pilot Adjustment Screw The following is a troubleshooting chart of possible problems: PROBLEM Manifold Pressure Test Connection Figure 33. Sit Nova 820 gas valve. CORRECTIVE ACTION Noisy Pilot Flame Locate pilot adjustment screw on gas control valve. Flame is decreased by turning adjustment screw clockwise. Pilot won’t ignite Disconnect remote wires and try to light pilot.
DV 42 ST See-through Gas Fireplace Maintenance Troubleshooting DV 42 ST E Follow this information to reset the SIT System: DV 42 ST Spare Parts 1. Locate the lead to the battery backup, (remove) (Refer to schematic, below) 2. Locate the AC/DC wall transformer, (Unplug connector) (Refer to schematic, below) NG Gas Valve NG Pilot NG Burner Orifice Door Base DV 42 ST RGC1006 RPA020 RBL42S01 ROR1153 RDTL42 RLG550 DV 42 ST E RGC3033 RPA052 RBL42S01 ROR1153 RDTL42 RLG550 1. 2.
DV 42 ST See-through Gas Fireplace Warranty The Warranty The Company warrants the European Home Gas Appliance to be free from defects in materials and workmanship at the time of manufacture. On the European Home Gas Appliance, there is a ten-year warranty on the firebox and its components, a five-year warranty on the main burner and pilot burner, and a one-year warranty on the gas control valve and fibre logs. Glass, plated/ painted finishes, and refractory lining are exempt.
DV 42 ST See-through Gas Fireplace Appendix A - Termination Locations A = clearance to the termination frame above grade, veranda, porch, deck, or balcony [16 inches (41 cm) minimum] (2.
DV 42 ST See-through Gas Fireplace Appendix B - State of Massachusetts Amendment (Gas Fireplace / Equipment sold in the State of Massachusetts) 5.08: Modifications to NFPA-54, Chapter 10 (1) Revise NFPA-54 section 10.5.4.
NOTES
EUROPEAN HOME a division of Europa Ja, Inc. 376 Washington St. Suite 203 Malden, MA 02148 tel: 781/324-8383 fax: 781/324-8384 www.europeanhome.