Owner`s manual

Page 6
DV 42 ST See-through Gas Fireplace
rev.110308
Installation
Installing Terminations with Built-In Frames
Installing Terminations with MSR Frames
12
12
1. Frame the termination opening to 12" x 12".
2. Fasten the termination to the studs using a minimum of 4 screws.
11
11
1. Frame the termination opening to 11" x 11".
2. Fasten the termination to the studs using a minimum of 4 screws.
Installing Terminations with MOSR Frames
MOSR
1. Frame the termination opening to 12" x 12".
2. Fasten the MOSR frame to the interior side of the studs using a minimum of 4
screws.
3. Insert the termination into the MOSR frame as shown here, and attach by
screwing through the four pilot holes in the termination.
MSR
PTO-4 (5"/8")
PTO-4 (5"/8")
PTO-4 (5"/8")
PTKOG (5"/8")
1. Ensure that the two long mounting brackets are facing the bottom of the
termination. (See inset). This will provide more heat protection at the top of
the termination, where temperatures are highest.
2. Attach to the faceplate of the termination using four sheet metal screws.
Installing Heat Guards over Terminations
Installing the Nailing
Flange Extension
Once the replace is placed into the rough framed opening and the supplied steel
lintel is in place (Part No. L42087) (see Figure 2), the supplied nailing ange
extension must be placed along the top edge of the replace and securely fastened
in place to the metal lintel and combustible wood framing. Note: The nailing ange
extension can be substituted with a piece of NON-COMBUSTIBLE material of the
same size and thermal characteristics, i.e.: cement board or equivalent.
CAUTION:
Do not obstruct, or attempt to conceal, the vent termination. These actions
will aect the operation of the replace, and may be hazardous.
In heavy snow areas, take extra care to prevent snow buildup from obstructing
the vent termination.
Figure 5a. Installing a PTO termination.
Figure 5b. Installing a PTO termination with the MSR frame.
Figure 5c. Installing a PTO termination with the MOSR frame.
Figure 5d. Installing a PTO termination heat guard.
Figure 6. Installing the Nailing Flange Extension.