Manual
EVCO S.p.A.
EVBOX1 | Installation guide ver. 1.3 | Code 144BOX1E134
page 44 of 92
h06 0 999 s
not
avail.
not
avail.
not
avail.
not
avail.
not
avail.
not
avail.
30 30 PID action derivative time
h07 1 250 s
not
avail.
not
avail.
not
avail.
not
avail.
not
avail.
not
avail.
5 5 starting delay
h08 -1 100 %
not
avail.
not
avail.
not
avail.
not
avail.
not
avail.
not
avail.
-1 -1
percentage valve open during the manual operation
-1 = the superheating will be enabled
h09 0 100 %
not
avail.
not
avail.
not
avail.
not
avail.
not
avail.
not
avail.
0 0
percentage valve open during the hot gas defrost (during
the pre-dripping and the dripping the valve will be closed,
during the evaporator fan delay the valve opening will be
function of the algorithm of regulation)
h10 0 45.0
bar g /
PSI g (4)
not
avail.
not
avail.
not
avail.
not
avail.
not
avail.
not
avail.
1.0 1.0
evaporating pressure below which the compressor is
switched off during the pump down
h11 0 250 min
not
avail.
not
avail.
not
avail.
not
avail.
not
avail.
not
avail.
3 3
high superheating alarm delay (code “HSH”) and
operative low pressure alarm delay (code “LOP”)
h12 0 1 - - - -
not
avail.
not
avail.
non
disp.
non
disp.
non
disp.
non
disp.
0 0
enabling the low pressure alarm (code “LP”)
1 = YES
h13 -0.5 45.0
bar g /
PSI g (4)
not
avail.
not
avail.
not
avail.
not
avail.
not
avail.
not
avail.
0.0 0.0
evaporating pressure below which the lower pressure
alarm is activated (code “LP”) (44)
h14 0 250 min
not
avail.
not
avail.
not
avail.
not
avail.
not
avail.
not
avail.
3 3 low pressure alarm delay (code “LP”)