Installer manual User Manual
EVCO S.p.A. EVXV 800 range | Installer manual ver. 1.2 | Code 144XV800E124
page 35 of 66
r3 -50.0 99.0 °C/°F (1) 3.0 3.0
temperature-controlled blast chilling end time
temperature; also end temperature of the
temperature-controlled soft deep freezing
phase (temperature detected by the needle
probe); also see parameter r5
r4 -50.0 99.0 °C/°F (1) -18.0 -18.0
temperature-controlled deep freezing end
temperature (temperature detected by the
needle probe); also see parameter r6
r5 1 500 min 90 90
maximum duration of temperature-controlled
blast chilling; also see parameter r3
r6 1 500 min 240 240
maximum duration of temperature-controlled
deep freezing; see parameter r4 also
r7 -50.0 99.0 °C/°F (1) 0.0 0.0
work set-point during blast chilling; also work
set-point during the soft deep freezing phase
(cabinet temperature); also see parameter r0
r8 -50.0 99.0 °C/°F (1) -40.0 -40.0
work set-point during deep freezing (cabinet
temperature); also see parameter r0
r9 -50.0 99.0 °C/°F (1) -20.0 -20.0
work set-point during blast chilling hard
phase (cabinet temperature); also see
parameter r0
r10 -50.0 99.0 °C/°F (1) 2.0 2.0
work set-point during post blast chilling
storage (cabinet temperature); also see
parameter r0
r11 -50.0 99.0 °C/°F (1) -20.0 -20.0
work set-point during post deep freezing
storage (cabinet temperature); also see
parameter r0
r12 -50.0 99.0 °C/°F (1) 5.0 5.0
work set-point during pre-cooling (cabinet
temperature); also see parameter r0
r13 -50.0 99.0 °C/°F (1) 15.0 15.0
end temperature of the temperature-
controlled hard blast chilling phase
(temperature detected by the needle probe)