Installer manual User Manual
EVCO S.p.A. EVXV 800 range | Installer manual ver. 1.2 | Code 144XV800E124
page 36 of 66
r14 10 100 % 60 60
duration of the time-controlled hard blast
chilling phase (intended as a percentage of
the value established with parameter r1);
also duration of the time-controlled soft deep
freezing phase (intended as a percentage of
the value established with parameter r2)
r15 -50.0 99.0 °C/°F (1) 65.0 65.0
temperature below which the count of the
maximum temperature-controlled blast
chilling and maximum temperature-controlled
deep freezing is started (temperature
detected by the needle probe)
r16 0 2 - - - - 1 1
type of operating cycle that can be selected
0 = blast chilling and storage
1 = blast chilling and storage or deep
freezing and storage
2 = deep freezing and storage
r17 0.0 99.0 °C/°F (1) 5.0 5.0
"temperature detected by the needle probe -
cabinet temperature" minimum difference
such to consider the first phase of the test to
verify correct insertion of the needle probe
completed successfully (consider the
difference without sign)
0.0 = the test will not be performed (neither
first or second phase)
r18 1 99 s 60 60
duration of the second phase of the test for
verification of correct insertion of the needle
probe
r19 0 1 - - - - 0 0
quick modification value during the "On"
status before starting the operating cycle
0 = work set-point during blast chilling or
during deep freezing
1 = blast chilling or deep freezing end
temperature