Installation Guide
GENERAL INDICATIONS
- Horizontal installation – start applying the ller metal at the bottom of the joint then upward allowing bottoming portion to dam
up upper portion.
- Allow completed joints to cool in a natural way. Cooling with water will cause unnecessary stress on the valve.
- It is strongly suggested to wrap the valve body with wet rags or employ other heat absorbing techniques to avoid damaging valve
seats and thread sealant.
Avoid overheating in
the indicated area
Cover the valve
with a wet rag.
OPERATION
The valve handle is marked showing proper rotation direction for “ON” and “OFF” positions. Standard rotation is clockwise for “OFF”
(closed) and counterclockwise for “ON” (open).
MAINTENANCE
This valve has been designed with double O-Ring technology on the stem and therefore it doesn’t require any maintenance.