Installation Guide

14 For Professional Technical Support call 1-844-241-5521
Deep Well Installation (continued)
10
Removing the elbow insert from the
pump body 11
Connecting the pressure gauge to
the elbow insert hole
Pull out the pressure tube from the 90° elbow insert.
Unthread and remove the elbow insert from the pump body.
Wrap the threads of the 1/4 in. pressure gauge (included) with
thread tape and thread it in the elbow insert hole.
Cut off the expanded portion of the pressure tube.
12
Priming the pipe & pump
13
Connecting the pressure regulator to
the pump
Fill the pipe with water until water overflows. Replace the plug
back to the tee.
Fill the pump with water until water overflows.
NOTE: It may take several minutes to fill the pipes and the
pump completely.
NOTE: If the pump does not hold its prime, inspect all pipes
and connections for leaks, and repair the leaks.
Wrap thread tape around the threads of a 1 in. pressure regulator.
Using a pipe wrench, thread the 1 in. pressure regulator into the
top of the pump.
NOTE: This pressure regulator is a normally-closed valve
installed at the discharge of the pump to provide an obstruction
to flow and thereby regulate the pump pressure and provide
back pressure for the ejector. Failure to use this item may result
in a loss of prime and/or a low pressure.
Pressure regulator