Instructions / Assembly

1-800-476-7366
|
INFO@EVERLASTCLIMBING.COM
|
WWW.EVERLASTCLIMBING.COM
© 2014 EVERLAST CLIMBING, A PLAYCORE COMPANY
HOME CLIMBING WALL INSTALLATION INSTRUCTIONS
9
RED RELIEF LINE INSTALLATION FIGURE 14aa
RED RELIEF LINE INSTALLATION FIGURE 14ba
3'
D. INSTALLATION OF RED-RELIEF LINE
®
1. Using the provided hardware, attach the Red-Relief Line
®
to the panels
at a distance of 3’–31/2’ from the floor as shown in FIGURE 14a
1. The individual pieces of the Red-Relief Line should be touching one
another and span the full length of the wall. SEE FIGURE 14b.)
2. *Not included with Superior Wall panels.