Instructions / Assembly

1-800-476-7366
|
INFO@EVERLASTCLIMBING.COM
|
WWW.EVERLASTCLIMBING.COM
© 2014 EVERLAST CLIMBING, A PLAYCORE COMPANY
HOME CLIMBING WALL INSTALLATION INSTRUCTIONS
13
Care & Maintenance
The proper care and maintenance of your climbing wall is essential and is
your responsibility. Inspect your climbing wall, its components and protective
surfacing on a regular basis. These inspections should include, but are not
limited to the lists that follow.
SURFACE
• Panels should be installed according to installation instructions.
• Check panels to make sure they are in good condition and show no
signs of damage.
• Check each panel’s adherence to the wall. Tighten only when they are
loose. Do not overtighten!
• Check for sharp points and edges.
• Remove or repair any damaged wall areas.
HAND HOLDS
• Hand Holds should be mounted according to installation instructions.
• Observe holds for signs of stress or breakage.
• Remove and replace any damaged holds.
• Check hand holds for looseness and tighten. Do not overtighten!
• Wash hand holds periodically to remove oils, stains and other residue.
Use mild soap and water with a soft bristle brush. Towel dry washed
holds then air dry for 24 hours to ensure complete drying.
Note: Hand Holds are also dishwasher safe!
• Inspect climbing routes for unsafe maneuvers. Make sure all routes
are reviewed carefully before they are climbed.
MATS
• Mats should be used for traverse climbing activities only.
• Mats are not to be used as tumbling, crash or landing mats.
• Inspect mats for damage and proper positioning before use.
• Check mats for tears, soft spots, separation of foam and fatigue
(failure to perform adequately).
• Remove defective mats immediately and adjust activity accordingly.
• Mats should extend 6’ from all climbing surfaces.
• Never place objects on mats while people are climbing.