Installation manual
INSTALLATION INSTRUCTIONS
Affinity 30Ge
Evo, Inc. | 8140 SW Nimbus Ave., Bldg 5 | Beaverton, Oregon 97008 USA
Phone 503.626.1802 | Fax 503.213.5869 | www.evoamerica.com | support@evoamerica.com
12
25
1
4
"
641.35mm
6
9
16
"
166.55mm
3X
7.65in
194.36mm
1
3
16
"
30mm
2
23
32
"
69.21mm
8
15
32
"
215.32mm
SIDE VIEW
Example of 3/8” tile with substrate for a minimum 3 cm overall. Make sure you allow for the
countertop overhang as shown.
Metal
Right Angle
Mounting
Brackets
(supplied)
Shelving or
drawers can
be installed
under Affi nity
30Ge if
desired.
Finished cabinet face
set back from fi nished
countertop front edge
COUNTERTOP INSTALLATION (3 of 4)