Use and Care Manual

2
EVOLVESTONE.COM
Contents
Product Usage and Overview 3
Tools and Materials 3
Safety 3
Installation Instructions 4
Standard Installation Method (Nail On over Wood Substrate)
4
Alternate Installation Method (Glue-Up over Cementitious Substrate)
9
Alternate Installation Method (Nail On over Furred-out Substrate)
12
Installation Pattern Guide 15
Appendix A: Typical Evolve Stone Installation Details 19
Over Wood Wall and Band Board
19
At Foundation Wall Base
20
Inside Corner
21
Outside Corner
22
Over Wood Framing
23
Transition
24
At Sidewall and Roof
25
At Deck Termination
26
Typical Wall Types
27
At Window/Door
28
Flanged Penetration Flashing
29
Non-Flanged Penetration Flashing
30
Over Concrete or CMU
31
At Wood Framing to Foundation Wall
32
Furring Transition where Sheathing is not Coplanar w/ Masonry
33
Furring Transition where Sheathing is Coplanar w/ Masonry
34
Furring Transition where Sheathing is not Coplanar w/ Masonry Sill on Furring
35
At Door
36
Appendix B: Link to Water Management Guide 37