Use and Care Manual

2.1.2 Medium Stones:
For stones that are between
10” and 18” long and less than
5” tall, apply three or more
16-gauge stainless steel finish
nails at slight angles on the left,
right and the center along the
horizontal centerline as depicted
in the image at right
2.1.3 Large Stones:
For stones that are larger than
5” tall, apply two rows of nails
following the patterns described
above based on their lengths as
depicted in the image at right:
Notes:
1. The EVOLVE stones must be pressed firmly against the mat. Hold the stone true, straight,
tightly against the mat and pin nail into place. Evolve has specified the minimum nailing
pattern. It may be necessary to install additional pin nails to allow for a firm and stable feel,
tapping the installed stone with your hand will ‘show’ the stones requiring more nails.
2. It is critical water is allowed to drain from behind the Evolve Stone. It must not be directed into
water sensitive areas
6
EVOLVESTONE.COM
1.3 Install Sills (Optional)
Beginning at the corners, make cuts or miter as necessary. Fasten the sill pieces through the face
using two exterior (or more as necessary) grade self-tapping trim screws centered 4” from each
end. Recess the screw slightly below the face of the stone.
Pro-Tip: Using a color
matched exterior grade
polyurethane sealant, fill
any screw countersink
holes or fill the gaps
bridging two abutting sills.
See Detail #5 and Detail #6
Blocking if required