ALUMINIUM GREENHOUSE Riga S/Riga Subject to technical changes! Current as of 09/2015 Basic kit assembly instructions model Riga system width 2,96 m / 9ft 8in model Riga S system width 2,32 m / 7ft 8in
Dear garden friend, Congratulations on the purchase of an aluminium greenhouse made by The construction is simple. First, read all the assembly instructions then follow them step by step. Parts and parts list Please store all boxes in a dry area protected from direct sunlight! Quantity of cartons basic construction (gable/eaves) curved center profile windows/ doors glazing Riga S/II/III/IV 1 1 1 1 Riga III/IV/V 1 1 1 1 Start with the box labeled "basic kit".
For the configuration you need the following tools: pc. Phillips screwdriver size 2 pc. 10mm Wrench pc. 3mm allen key (included in the accessoires bag of the roof window) pc. level pc. stepladder 1 pc. file to remove any burrs on the profil pc. rubber hammer pc. tape measure You should be careful: If forgotten, hexagonal screws can also be inserted later in the plastic slider! Wedge seals (V23) Pull them apart at the center.
!!!Note: Important information for glazing!!! When installing the polycarbonate glazing make sure the UV coated side faces out. Loosen the edges of the protective film for installation. After the assembly is complete pull it off immediately. Do not leave the film on for any period of time in the sunlight. Several days of sunlight can burn the film firmly on the glazing.
Foundation frame (optional) !!!Warning: Use only according to instructions. See below!!! This is the easiest and the safest foundation for a greenhouse. ATTENTION! When using a foundation frame attach it to the soil profile before these steps (see pages 5, 6) The foundation frame hooks into the soil profile and the corners are bolted together with a corner angle (V26). (See page 6). Use the supplied self taping screws to firmly attach the soil profile to the foundation frame.
Assembly foundation frame Rotate the foundation frame profile into the soil profile. Make sure it is centered in the soil profile. Note: The foundation frame profiles are shorter than soil profiles To stabilize the greenhouse, use the mounting bracket (V27) with bolts M6 x 2 (S 2) Bolt the (V27) to the foundation frame and the side curves or door frames. Use the supplied self tapping screws to firmly attach the soil profile to the foundation frame.
W2 upper edge of ground exterior edge of the greenhouse exterior edge of the foundation W1 frost-free ground Riga S II Riga S III Riga S IV Riga III Riga IV Riga V model 249 249 249 312 312 312 1 foundation 232 338 443 338 443 549 L1 233 233 233 296 296 296 216 322 427 322 427 533 greenhouse W2 L2 Centimeters divided by 2.54 = inches For instance 233cm/2.54=91.7in Suggestion: Assemble the lower frame (soil profiles 1.1/2.
Main box Contents - basic kit Riga S/Riga Please check contents list to make sure all items are there Profiles for both gables: overview pos. 1.1 number/length in mm Riga S Riga II III IV III IV 2 2 2 2 2 2238 2238 2238 2874 2874 description soil profile/gable V 2 2874 .5.4 Edge curve left 2 2 2 2 2 2 .5.
Accessories bag basic kit Riga S/Riga overview num- number ber RigaS Riga description/ pos. item number V9 Soil profile corner V5 connecting plate V10 connecting plate 90 x 35 mm V11 endplate ridge/gutter V4 connecting plate item no 9999 0003 item no 9999 0028 item no 9999 0030 Edge Clamp/Door Frame For mounting cross bar/rear item no 9999 0075 for cross bar/roof window item no 9999 0031 V12 corner 30/30/2/15 mm item no 9999 0072 S21 blind plug Ø10 mm V 4 door hose section 760 mm lg.
Assembly procedure gable ATTENTION! When using a foundation frame attach it to soil profile in advance (see pages 5, 6) step 1 to step 1: Items needed: Pos 1.6 (Door frame left) Pos 1.7 (Door frame right with 8 holes) Pos 1.1 (Soil Profile) Soil Profile Corner (V9) Slide pos 1.6 and pos 1.7 up to the small holes in the middle of pos 1.1(soil profile). The chamfered edge must be facing to the outside. Then attach the soil profile corner (V9) to the ends of the soil profile. door frame right (pos.1.
Assembly procedure gable ATTENTION! When using a foundation frame attach it to soil profile in advance (see pages 5, 6) step 5 view from outside to step 5: The square peg in the soil profile corner (V9) is plugged into the bottom of the Edge curve (pos.1.5.4/1.5.6). glazing Edge curve left - (pos. .5.4) Edge curve right - (pos. .5.6) The small triangular glazing is positioned in the door frame top (pos 1.8) The Edge curve (pos.1.5.4/1.5.
You should be careful: T-seal (V25) is for all doors and windows (total: 5 meters/49 feet) Attention! The T-seal (V25) is only inserted on three sides of the roof window. The top side slides into the roof beam so no seal is required. In the door threshold, the hose section (V14) is pressed into the soil profile. This prevents dirt from getting into the soil profile. Attention! In the lower door press the seal into the profile first then install the rectangular tube.
Assembly roof window corner with grub screw (V13) corner bracket/roof window (V24) Top window profi e (pos.4.2) Side window profi e (pos. 4.1) Attach the roof window side profiles to the bottom roof window profile using the corner brackets and the metal corners with grub screws. Insert the roof window glazing into the side/bottom profiles you have assembled. Attach the top roof window profile, tighten all grub screws and insert T seal on the three lower sides of the roof window.
Sealing the roof window area pos. 4.1 Please apply silicon to the 4 plastic corner connectors before installation into the roof window profiles. ( ). ▲ ▲ ▲ pos. 4.1 pos. 3.2 cross-section of the seal length: 2,3 m The seal is inserted as the sketch above. Attention: Do not cut the seal in the corners! Important! Please seal all connections of the roof window with silicon: Corner connector to side and bottom profile and glazing to side and bottom profiles. → see sketch.
Automatic Window Opener 2 3 4 5 opener frame pressure cylinder cotter pin mounting plate window profile mounting plate cross bar 3 3 4 2 5 Auto Opener Installation 1. Check whether the greenhouse window can open and close freely and unhindered. 2. Install the window opener with the mounting plate (4) in the center of the lower roof window profile (pos 4.2) 3. Secure the cylinder by lining up the hole in the piston with the upper hole in the Tcoupling, then insert the cotter pin. 4.
Profiles for divided revolving door - bottom overview numlength in mm ber pos. description 5.3.1 door profile botto 1 700 5.6 door profile lef with hole for sash lock 1 692 5.7 door profile righ with hinge hole 1 692 5.9 door profile to with transverse hole 1 700 5.8 square tube with transverse hole 1 740 number length in mm Content accessories bag divided revolving door - bottom overview pos.
Assembly - divided revolving door - bottom view from outside Lay the profiles out like the diagram below (possibly on cardboard or something similar). First: Insert T seal in Door profile top (pos 5.8) corner bracket door profil (V30/V31) Second: Attach square tube to door profile to (pos 5.8) with pan head screw 3,5 x 38 (S6). QR-stopper (V29) square tube (pos. 5.8) door profile right (pos. 5.7 sash lock (V28) with self-tapping screw countersunk head 3,5 x 22 (S19) scews. door profile left (pos. 5.
Profiles for divided revolving door - top overview pos. description 5.1 door profile lef 5.2 door profile righ 5.3 door profile to with hinge hole with hole for lockable door handle 5.4.1 cross bar number/length in mm Riga S Riga 1 1 1081 1264 1 1 1081 1264 1 1 700 700 1 1 700 700 Content accessories bag - divided revolving door - top overview number/length in mm Riga S Riga pos.
Assembly - divided revolving door - top - view from outside Place the profiles on the ground or a flat surface like the diagram below (possibly on cardboard or something similar). corner bracket door profil (V30/V31) door profile top (pos. 5.3 door profile right (pos.5.2 Assembly of door handle 2. door profile left (pos.5.1 1. 3. 4. Fix glazing block in place with silicon cross bar (pos.5.4.
Profiles for rear window overview pos. description 5.1.2 door profile left 5.2 with hole for sash lock door profile right with hinge hole 5.3.1 door profile top 5.4.2 door profile bottom with hole for window opener number/length in mm Riga S Riga 1 1 1081 1264 1 1 1081 1264 1 1 700 700 1 1 700 700 Content accessories bag - rear window overview number/length in mm Riga S Riga pos.
Assembly - rear window - view from outside sash lock, small (V28) with self-tapping screw countersunk 3,5 x 22 (S19) screws door profile right (pos. 5.2 door profile left (pos. 5.1.2 door profile top (pos. 5.3.1 glazing block with silicone fix in positio self-tapping screw countersunk head 4,2 x 45 (S17) cross bar (pos. 5.4.2) opener for rear window hex screw M6 x 12 (S12) The required mounting bracket is placed on the preinserted M6 x 6 (S5) bolts and screwed with nuts M6 (S ).
Installation of Door Catch Door Catch Placement Riga Model IIs, IIIs, IVs Edge Curve Handle with Screw Cap 3.5 x 13mm Screw Door Catch Placement Riga Model III, IV, V Crossbar Crossbar Handle without Screw Cap 3.
Assembly procedure - eaves - ATTENTION! When using a foundation frame attach it to the soil profile before these steps (see pages 5, 6) step 8 to step 8: Note: If you have purchased a foundation frame attach it to the soil profiles before you attempt this step. First attach the soil profiles(pos 2.1) to the end gables with the preinstalled corner connectors(V9). Next screw the corner bracket (V12) to the gable end soil profile and the side soil profile. This will secure the gable end to the side wall.
Assembly procedure - eaves ATTENTION! When using a foundation frame assemble in advance on this soil profile (see pag s 5, 6) to step 11: step 11 shown enlarged side curve (pos. 2.3) First place a side curve up against the edge curve installed on the gable end. You want to match curvature of the edge curve with the side curve. This will ensure that the side curve is installed in the correct direction. Slide the side curve (pos 2.3) into the ridge profile and into the soil profile.
Assembly procedure -eavesATTENTION! When using a foundation frame attach it to soil profile in advance (see pages 5, 6) to step 14: step 14 Attach the preassembled door gable. Refer to steps 8-9 for attachment procedures. For added stability install the inside corner (V ). Use the self-tapping screw pan head 4,2 x 3 (S9). to step 5: step 15 Install the door and windows. Instructions, see page 2-2 . Mounting roof window wrong!!! right step 16 to step 16: The stabilization angle (pos 3.
b 4 730 x 728 4 730 x 728 4 730 x 728 4 1048 x 728 4 1048 x 728 4 1048 x 728 4 730 x 1135 4 730 x 1135 4 730 x 1135 4 1048 x 1319 4 1048 x 1319 4 1048 x 1319 Riga II S Riga III S Riga IV S Riga III Riga IV Riga V a number size (a x b) a b 2 779 x 239 2 779 x 239 2 779 x 239 2 779 x 239 2 779 x 239 2 779 x 239 number size (a x b) a gable triangular 2 724 x 1215 2 724 x 1215 2 724 x 1215 2 724 x 1031 2 724 x 1031 2 724 x 1031 number size (a x b) a b div. revolv.