Instructions / Assembly

Riga S Riga
730 x 728 1048 x 728
10
Assembly procedure gable
ATTENTION! When using a foundation frame attach it to soil profile in advance (see pages 5, 6)
soil profile (pos.1.1
door frame right (pos.1.7)
door frame left (pos.1.6)
soil profile corner (V9)
step 1
glazing
glazing
self-tapping screw pan head 4,2 x 13 (S9)
Note: Only attach after the door is mounted and
aligned
cross bar (pos.1.9)
cross bar (pos.1.9)
view from inside
self-tapping screw pan head 4,2 x 13 (S9)
connecting plate (V5)
screw M6 x 16 (S5)
with nut M6 (S1)
glazing
door frame
top
(pos.1.8)
glazing
to step 1:
Items needed:
Pos 1.6 (Door frame left)
Pos 1.7 (Door frame right with 8 holes)
Pos 1.1 (Soil Profile)
Soil Profile Corner (V9)
Slide pos 1.6 and pos 1.7 up to the
small holes in the middle of pos 1.1(soil
profile). The chamfered edge must be
facing to the outside. Then attach the
soil profile corner (V9) to the ends of the
soil profile.
step 2 to step 2:
Now you need the small side glazing.
Slide the side glazing into the door
frames and soil profile.
The dimensions are listed in the
diagram.
Note: After the door is mounted and
aligned attach pos 1.6 and pos 1.7 with
pan head screw 4,2 x 13 (S9).
step 3
to step 3:
Now insert the cross bar (pos.
1.9) onto the top of the glazing.
step 4
to step 4:
Items needed:
Two Connecting Plates (V5)
Pos 1.8 (Cross Bar-door frame top)
Four Hex Screws M6 x 16 (S5)
Slide one hex screw M6 x 16 (S5) into
the vertical door frames(pos1.6/1.7)
and two in the crossbar(pos 1.8)
Attach the crossbar to the door frames
with the connecting plate (V5).
Insert the curved glazing into the door
frames and cross bar (pos 1.9)
view from inside