ALUMINIUM GREENHOUSE Riga S/Riga Subject to technical changes! Current as of 02/2012 Basic kit assembly instructions model Riga system width 2,96 m model Riga S system width 2,32 m 1
Dear garden friend, congratulations on the purchase of an aluminium greenhouse made by The construction is simple. First read the assembly instructions and follow them step by step. Parts and parts list Please complete all boxes stored dry and protected from direct sunlight! number of cartons basic construction (gable/eaves) curved center profiles windows/ doors glazing Riga S/II/III/IV 1 1 1 1 Riga III/IV/V 1 1 1 1 Start with the basic kit.
For the configuration you need the following tools: 1 pc. Phillips screwdriver size 2 1 pc. foot-end wrench10 mm 1 pc. screwdriver 1 pc. allen key 3 mm (in the accessoires bag of the roof window) 1 pc. level 1 pc. stepladder 1 pc. file to remove any burrs on the profiles 1 pc. rubber hammer 1 pc.
!!!Note: Important information for glazing!!! The ISO-Cellular sheets, speak glazing, always install the UV coated side out. The plates have on the protective film has a hint. The protective film, first loosen the edges and only after the complete assembly pull it off immediately. After several days of sunlight can burn the film firmly on the plates and can be solved only with difficulty.
Foundation frame for digging (optional) !!!Warning: Use only according to instructions under foundation. See below!!! This is the easiest, safest and also foundation of a greenhouse. The foundation frame is hooked force-fit into the soil profile of the greenhouse screwed into the corners with a corner angle (V26). (See page 6). The foundation frame is assemble to coincide with the greenhouse together.
Assembly foundation frame The foundation frame profiles separately in the soil profiles rotate and center align. Note: The foundation frame profiles are shorter than soil profiles! Note: The foundation frame profiles are shorter than soil profiles! To stabilisize the house, the mounting bracket (V27) using bolts M6 x 12 (S12) retracted bolted to the foundation frame and the side rungs or door frames.
Foundation plan Riga S/Riga all dimensions in [cm] Foundation of your greenhouse with a strip foundation If you have not bought a foundation frame, the secure foundation by means fo strip foundation. Then please create such a foundation in accordance with the specified dimensions below. You have set up your possibility to the greenhouse on low cur stones such as, 50 x 25 x 8 cm or better 50 x 30 x 10 cm. Please note that the foundation is made evenly horizontally.
Content main box - basic kit Riga S/Riga Please check in the tables list the completeness of the components. Profiles for both gables: overview pos. 1.1 number/length in mm Riga S Riga II III IV III IV 2 2 2 2 2 2238 2238 2238 2874 2874 description soil profile/gable V 2 2874 1.5.4 rand rung left - curved 2 2 2 2 2 2 1.5.
Accessories bag basic kit Riga S/Riga overview num- number ber RigaS Riga description/ pos.
Assembly procedure gable view from inside ATTENTION! When using a foundation frame assemble in advance on this soil profile (see page S. 5, 6) step 1 to step 1: door frame right (pos.1.7) door frame left (pos.1.6) corner soil profile (V9) First, please slide the door frame left (pos.1.6) and the door frame (pos.1.7) (profile with 8 drill holes, a 30° chamfer and a black plastic glide) up to the small holes in the middle of the soil profile. The chamfer must show this to the outside.
Assembly procedure gable view from inside ATTENTION! When using a foundation frame assemble in advance on this soil profile (see page 5, 6) to step 5: holes for door lock The square peg of the corner connector is plugged in the rand rung (pos.1.5.4/1.5.6). Small triangular glazing positioned on the door frame (pos.1.8). rand rung right - curved (pos.1.5.6) rand rung left - curved (pos.1.5.4) step 5 glazing The rand rung by means of connecting plate (V5) screwed to the door frame.
You should be careful: T-seals (V25) for all doors and windows (total: 15 meters) Attention! When the roof window for pushing into the ridge the T-seal at this side omit!!! In the door area the hose section(V14) is pressed into the soil profile. (As a stop/seal to protect from dirt into the soil profile). Attention! In the bottom door is first pressed the seal, and only then will the rectangular tube screwed! Profiles for roof windows (per roof window) overview numlength in mm ber pos. description 4.
Assembly roof window corner with grub screw (V13) corner bracket/roof window (V24) window profil (pos.4.2) (Pull in this profile no seal!) Recommendation! It is advisable to seal up around the window and the corner bracket, thus no moisture can occur. Attention: In the bottom cross profile inserting two hex screws M6 x 12 (S12) for the window opener! window profil (pos. 4.1) window profil (pos. 4.1) First you screw three profiles, then use the glazing and finally attach the fourth profile.
Insertion of the seal in the roof window area pos. 4.1 Please insert all the 4 plastic corner connectors with silicone and seal the transitions cleanly ( ). ▲ cross-section of the seal ▲ ▲ pos. 4.1 pos. 3.2 length: 2,3 m The seal is inserted as the sketch above. Attention: Seal does not cut into the corners! Important! The transitions of the glazing and the corner bracket/roof window to roof it with silicone → window profile, please seal see sketch.
Parts window opener 1 2 3 4 5 window opener pressure cylinder cotter pin mounting plate window profile mounting plate crossbar 3 1 4 2 5 User guide - window opener Assembly instructions: 1. Check whether the greenhouse window can open and close freely and unhinderedly. Please remove from other manufacturers in advance the existing hand openers. 2. First install the window opener with the mounting plate (4) to the roof window profile (pos. 4.2). 3.
Profiles for divided revolving door - bottom overview numlength in mm ber pos. description 5.3.1 door profile bottom 1 700 5.6 door profile left with hole for sash lock 1 692 5.7 door profile right with hinge hole 1 692 5.9 door profile top with transverse hole 1 700 5.8 square tube with transverse hole 1 740 number length in mm Content accessories bag divided revolving door - bottom overview pos.
Assembly - divided revolving door - bottom view from outside Place the profile like the image on a flat underground (possibly on cardboard or something similar). Square tube and door profile top screw with self-tapping screw pan head 3,5 x 38 (S6). Attention: Move before sealing. (see sketch!) corner bracket door profile (V30/V31) QR-stopper (V29) square tube (pos. 5.8) door profile right (pos. 5.7) sash lock (V28) with self-tapping screw countersunk head 3,5 x 22 (S19) scews. door profile left (pos.
Profiles for divided revolving door - top overview pos. description 5.1 door profile left 5.2 door profile right 5.3 door profile top with hinge hole with hole for lockable door handle 5.4.1 crossbar number/length in mm Riga S Riga 1 1 1081 1264 1 1 1081 1264 1 1 700 700 1 1 700 700 Content accessories bag - divided revolving door - top overview number/length in mm Riga S Riga pos.
Assembly - divided revolving door - top view from outside Place the profiles like the image on a flat underground (possibly on cardboard or something similar). corner bracket door profile (V30/V31) door profile top (pos. 5.3) door profile right (pos.5.2) Assembly o door locking 2. door profile left (pos.5.1) 1. 3. 4. glazing block with silicone fix in position crossbar (pos.5.4.
Profiles for rear window overview pos. description 5.1.2 door profile left 5.2 with hole for sash lock door profile right with hinge hole 5.3.1 door profile top 5.4.2 door profile bottom with hole for window opener number/length in mm Riga S Riga 1 1 1081 1264 1 1 1081 1264 1 1 700 700 1 1 700 700 Content accessories bag - rear window overview number/length in mm Riga S Riga pos.
Assembly - rear window view from outside sash lock, small (V28) with self-tapping screw countersunk 3,5 x 22 (S19) screws door profile right (pos. 5.2) door profile left (pos. 5.1.2) door profile top (pos. 5.3.1) glazing block with silicone fix in position self-tapping screw countersunk head 4,2 x 45 (S17) crossbar (pos. 5.4.
Assembly procedure - eaves ATTENTION! When using a foundation frame assemble in advance on this soil profile (see page 5, 6) step 8 to step 8: First, the lateral soil profiles on the corner bracket on the gable attach. ) 2.1 s. po et ( file ack pro er br l i so corn to corner bracket (V12) screwed with self-tapping screw pan head 4,2 x 13 (S9). slid e to step 9: step 9 ridge profile (pos. 3.
Assembly procedure - eaves ATTENTION! When using a foundation frame assemble in advance on this soil profile (see page 5, 6) step 11 to step 11: The side rung (pos. 2.3) above into the ridge profile and below into the soil profile to glazing insert it. There, the plate is threading. If neccessary, timber and plastic hammer to get help. Tip: Greasing plastic gliders perhaps a little! shown enlarged side rung (pos. 2.3) step 12 to step 12: Insert further side glazing and rungs.
Assembly procedure - eaves ATTENTION! When using a foundation frame assemble advance on this soil profile (see page 5, 6) to step 14: step 14 The door gable is pre-mounted and screwed. For added stability must now mounting inside corner (V1) be attached. Use the self-tapping screw pan head 4,2 x 13 (S9). to step 15: step 15 Install door and window. Instructions, see page 12-21. Mounting roof window wrong!!! right step 16 to step 16: Represented for the better representation plates cut.
glas plan with ISO-cellular sheets 10 mm gable above gable below gable triangular door/ window div. revolv.