Installation Guide
Table Of Contents
Profile/part design Pos. Description
Quantity/Length in mm
Typ IV Typ V Typ VI
6.1
Foundation frame profile for
gable
2
4085
2
4085
2
4085
6.2
Foundation frame profile for
the sides
2
3864
2
4859
2
5853
Attaching the foundation frame (optional accessory)
Profiles and hardware for foundation frame:
1.
First hook the foundation frame into the soil profile, then
rotate it into position.
Note: Make sure the foundation frame pieces are centered
in the soil profile. The foundation frame will be shorter in
length than the soil profiles.
2.
Once in position use self tapping screws to secure the
foundation frame to the soil profile. This is shown
above.
3.
When the greenhouse has been fully
assembled backfill both sides of the foundation
frame with soil, or your media of choice.
Assembly of foundation frame
1.
Note: Foundation frame profiles are
shorter than the floor profiles!
2. 3.
Self tapping screw
-------
13