ALUMINIUM Greenhouse Riga XL As at 10/2009 Assembly Instructions Type IV Type V Type VI
Dear Garding Friend, thank you for buying a top quality greenhouse from HOKLARTHERM in Germany. Please read these Assembly Instructions and helpful suggestions carefully. If you follow them step by step you should not have any difficulty assembling your EXTRA LARGE RIGA Greenhouse. Good Luck! What to do First: Check all the boxes you have received. Make sure you have received the correct number as shown on the Bill of Lading from the freight carrier.
What you will need: - Patience - do not rush - 2 people (3 will make it easier - when inserting the glazing panels) - Gloves - the ends of the aluminium profiles can be „sharp“ - Measuring tape - 2 A-frame step ladders (10‘ and 8‘ preferable) - 2 Rubber mallet - Adjustable wrench - 10 mm socket wrench - 10 mm wrench - Philips head screwdriver (manual and electric) - Level - Permanent Marker (to mark glazing panels) Depending on the greenhouse you have received 9 to 10 boxes: Quantity Content table 1x Ba
Contents of main box - basic construction Please check out the tables, the completeness of the components. Profiles for both gables: Profile design Pos.
Accessories bag basic construction Part design Pos. Description Quantity 100 Plastic corner connector 101 Straight connector plate 102 T-connector slanted 103 T-connector 104 T-connector slanted 105 Floor profile connectors 107 Hexagon head screw M6 x 16 + nuts M6 108 Washers (f. pos.
Profiles for each roof window Profile design Pos. Description Quantity Length [mm] 34 Window profile - roof 2 865 35 Window profile - roof 2 993 Quantity Length [mm] Profiles for each divided revolving door - at the bottom Profile design Pos.
Accessories bag for divided revolving door - at the bottom Part Design Quantity Pos.
Attaching the foundation frame (special accessories) Profile and accessoiries for foundation frame: Profile/part design Pos. 6.1 6.2 6.3 117 118 Description Foundation frame profile for gable Foundation frame profile for sides Foundation corner connectors 40/40/2 Hexagon head screw M6 x 12 + nut M6 Self drilling screw 3,5 x 13 Quantity/Length inches Type IV Type V Type VI 2 2 2 4100 4100 4100 2 2 2 3869 4864 5858 4 4 4 135 135 135 36 40 44 8 8 8 Assembly of foundation frame 1. 2. 3. 1.
Establishment greenhouse Mounting brackets for the basis profile to doweling on customer requires a foundation. Part design Pos. Quantity/Length in mm Type IV Type V Type VI Description 6.7 Mounting brackets XL 14 16 18 107 Hexagon head screw M6 x 12 + nut M6 56 64 72 Note: In the floor profiles (gable/side) each with 2 screws M6 x 12 per rung by means of mounting brackets XL. Lateral stay bar (pos. 4/5/6/7/19) Mounting bracket XL Hexagon head screw M6 x 12 + nut M6 (pos.
Foundation plan Riga XL (All the dimensions in [mm]) Establishment of your greenhouse with „stripe-foudation“ If you did not buy a foundation frame, the greenhouse has to be erected safely by means of a stripe-foundation. Please arrange then such a foundation according to the dimension presets given below. You also have the possibility to found your greenhouse on flash kerb edge beams. (for ex.: 50 x 25 x 8 cm or better 50 x 30 x 10 cm) Please pay attention to the foundation being even and horizontal.
Assembly course gable Warning: If you have bought the foundation frame, it has to be attached to the base profiles FIRST! (Page 8) vertical profile middle, left (pos. 6) vertical profile middle, right (pos. 7) Step 1 inside 1x Attention: Before assembly inserting required M6 x 16 (pos. 107) in groove. In addition, per vertical profile pushing 2 screws M6 x 12 (pos. 117) for mounting brackets XL (pos. 6.7) . Step 2 Riga XL 980 x 944 az Gl inside 1x ing az Gl ing floor profile (pos.
Step 7 View from inside ing az Gl Crossbar (pos. 8) with straight connector plate (pos. 101)and screws inserted M6 x 16 (pos. 107) and Nut M6 connect. Gl az g in laz ing G Straight connector plate (pos. 101) Gl az ing az Gl ing Step 8 View from inside s. po Attention: Introduce necessary screws M6 x 16 (pos. 107) in profile groove before assembly. e e dg * y sta rba d( rve cu 2) ed ge sta yb 2x 2x # ar -c urv ed # (po s. 3) * * 2x in vertical profile - middle (pos.
Assembly course gable Warning: If you have bought the foundation frame, it has to be attached to the base profiles FIRST! (Page 8) Attention: Introduce necessary screws M6 x 16 (pos. 107) in profile groove before assembly. * . 16 pos pos. 2 Step 10 Step 11 Attach roof beam to back gable with endcap/cover plate (pos. 114) with Philips head screws 4,2 x 13 (pos. 111) po floor profile connector (pos. 105) + screw M6 x 16 + nut M6 (pos. 107) s. 1 1x m ea s. po 26 fb roo inside 1x s.
Step 16 Step 17 floor profile connector (pos. 105) + screw M6 x 16 + nut M6 (pos. 107) Build in doors and windows. Place door gable in front and screw down. mounting roof window false!!! right! Screw floor profile corner connector (pos. 116) in with screw 4,8 x 16 (pos. 113). Then you should look for: Step 18 Press sealing 6 - 8 mm in front between floor profile and glazing; between floor profile and lateral glazing (all inside of greenhouse).
Assembly roof window plastic corner connector (pos. 127) window profile (pos. 34) (No sealing to insert in this profile! Recommendation! It is useful to seal the panes all around and the corner connectors to avoid any penetration of humidity. Attention: Insert 2 screws in the cross-section at the bottom - for window opener! window profile (pos. 35) window profile (pos. 35) Screw down three profiles first with screw 4,2 x 60 (pos. 112), insert glazing and fix fourth profile.
Components window openers 1 2 3 4 5 window opener pressure cylinder splint pin mounting plate window profile mounting plate cross bar 3 1 4 2 5 Operation of a window opener Assembling instructions: 1. Check, that the window of the greenhouse can open and close freely and without hindrance. For other brands please dismantle the existing handopener in advance. 2. At first you mount the window openers with the mounting plate (4) on the window profile (5). 3.
Mounting divided revolving door - at the bottom View from outside Place the profiles according to the figure on a flat surface (possibly on a cardboard or similar). retangular tube and door-profile - top screwed with 4,2 x 50 (pos. 142) plastic corner connector (pos. 127) Attention Earlier move seal. (See scetch!) end cap for rectangular tube (pos. 137) rectangular tube (pos. 47) Attach the Sash Lock (pos. 136) with Phillips head screw 3,5 x 22 (pos. 141). door profil - left (pos.
Mounting revolving divided door - top View from outside Place the profiles according to the figure on a flat surface (possibly on a cardboard or similar). plastic corner connector (pos. 127) phillips head screw 4,2 x 60 (pos. 112) door profile - top (pos. 48) door profile - left (pos. 41) door profile - right (pos. 42) glazing block (pos. 143) door profile - bottom (pos. 43) Attach the Sash Lock (pos. 136) with Phillips head screw 3,5 x 22 (pos. 141).
Assembly instructions for lockable handle 9 1 2 8 3 7 4 5 19 6
602 x 1922 980 x 727 980 x 944 980 x 1008 888 x 835 980 x 3893 888 x 943 980 x 2830 602 x 1922 980 x 727 980 x 944 980 x 1008 888 x 835 980 x 3893 888 x 943 980 x 2830 602 x 1922 980 x 727 980 x 944 980 x 1008 888 x 835 980 x 3893 888 x 943 980 x 2830
Good advice for a quick and perfect assembly of the greenhouse from HOKLAR-THERM Most of the assembly can be done by you alone. It is best if you have further two persons being able to hold it for approximately half an hour when putting the greenhouse upright. If you want to go on mounting it alone you have to look for a secure, suitable mounting course by means of stay bars, ladder or other fixings. Unlike the most usual greenhouses, the mounting of the aluminium profiles is done together with the glazing.
Attention: In advance 4 screws have to be screwed in both vertical profiles and 4 screws into the crossbar. Push the glazing (Measurement: 980 x 944 mm) into the crossbar (pos. 8) and vertical profile (pos. 6 + 7). Push the verticale-profile - middle - left (pos. 4) and right (pos. 5) from a page in the floor-profile up to the glass side. The slope have to show to the outside. Then attach the corner connector (pos. 100). Attention: In advance 4 screws have to put in both verticale profiles.
Assembly of the lateral and roof segments Now you need some more assistance or corresponding aids! Set the gable upright, hold it or support it safely. Attention: You have to put in each one screw in the both sides of the floor profile. At first the lateral floor profile are to detach on the corner connector of the gable. The roof beam is now to introduce into the existing nuts/slots of the gable that the profile is flush in front.
Question: Is it necessary to „seal“ the greenhouse or greenhouse glazing respectively? Principally: not. However, we recommend to seal the horizontal transitions from the glazing to the profile (see sketch - broken lines ---) with neutrally linking, transparent silicon in order to have the most possible small amount of water and thus little dirt in the glazing reception.