User's Manual
Table Of Contents
- EX-i Series (TDD)
- Digital Microwave Radios
- Installation and Management Guide
- Legal Notice
- Open-Source License Information
- Table of Contents
- List of Figures
- List of Tables
- About this Document
- Introduction
- Pre-installation Tasks
- Link Engineering and Site Planning
- Familiarization with the i-Series Radios
- Initial Configuration and Back-to-Back Bench Test
- RF Output Power Setting
- Time Division Duplex (TDD) Factors
- Link Orientation and Synchronization
- Radio Synchronization
- Offset Timing
- Virtual Local Area Network (VLAN)
- Link Symmetry
- Simple Network Management Protocol (SNMP)
- System Installation and Initiation Process
- Installation
- Configuration and Management
- Command Line Interface (CLI)
- Telnet into the Command Line Interface (CLI)
- Exalt Graphical User Interface (GUI)
- Quick Start
- Navigating the GUI
- Radio Information Page
- Administration Settings Page
- Simple Network Management Protocol (SNMP) Configuration
- File Transfer Page
- File Activation Page
- Access Security Page
- System Configuration Page
- MHS Configuration Page
- Ethernet Interface Configuration Page
- VLAN Configuration Page
- T1/E1 Configuration Pages
- DS3 Configuration Page
- GPS Information Page
- Alarms Page
- MHS Status Page
- Performance Page
- Event Log Page
- User Throughput Page
- Diagnostic Charts Page
- Spectrum Analyzer Page
- Ethernet Utilization Page
- Reboot Page
- Manual Page
- Specifications
- Interface Connections
- DIP Switch Settings (-16 Models Only)
- Antennas
- DC Coupler for Antenna Alignment
- Troubleshooting
- Back-to-back Bench Testing
- General Compliance and Safety
- Dynamic Frequency Selection
- Safety Notices
- Regulatory Notices
- Regulatory Compliance
- Regulatory Domain Keys
- EIRP Limits for the United States and Canada
- EIRP Limits for the European Union and ITU Countries
- EIRP Limits for Australia
- Declaration of Conformity to the R&TTE Directive 1999/5/EC
- END USER AGREEMENT
- Copyright Notices
- Index
Exalt Installation and Management Guide
EX-i Series (TDD) Digital Microwave Radios
18 206501-019
2016-05-24
System Installation and Initiation Process
The tasks required for radio installation and initiation are outlined in the following figure.
Figure 9 Radio installation tasks
Path & Site
Analysis
Link Design
Build Antenna
Structures &
Egress
Mount
Antennas &
Transmission
Line
Install & Test
Network &
Power Wiring
Read This
Manual
Completely
Pre-configure
Radios
Perform
Back-to-Back
Test
Mount Radios
Connect
Transmission
Line
Connect
Power
Align
Antennas to
Planned RSL
Verify LEDs
for Good Link
Test Network
Connectivity
Connect &
Test Primary
Services
Test Network
Management
System
Both Transmission
System & Radio
Preparation Tasks
Must Be Complete
Transmission System Tasks Radio Preparation Tasks