Technical data

31
NEW EXCALIBUR
English
For correct reassembly, see the exploded diagram for the
pump unit, and invert the order used for disassembly.
Once the unit has been positioned correctly, tighten the lock
nut (P37) hard against the front template.
To tighten, use a 45 mm spanner.
Close the inspection cover (P2) again.
Fit the suction pipe (P8).
Put PTFE tape or liquid PTFE over the threaded part (P39)
before screwing it onto the foot valve..
P37
P2
P8
P39