User guide
Chapter 2 Installation and Setup
2-3
Life|point
®
InTouch Phone User Guide
If using a 48V DC power supply for networks 4. without POE, connect the AC cord to the supply
and the wall outlet. Connect the supply’s DC barrel plug to the power jack on the rear panel.
Caution: Do not use a 48V DC power supply if the network also provides POE to the LAN cable.
POE
LAN Jack
48V DC
Power
Input
Activity
LED
Link
LED
Reset
Switch
Verify that the 5. Activity LED on the NETWORK jack is ashing green to show the phone is
communicating with the network. If a high-speed (100MB/s) link is present, the Link LED turns
green. Wait for the phone to go through its boot process. This can take from 5 to 10 minutes to
complete.
Continue to the next section, 6. Commission a Phone.










