Installation Manual

18 19
Leak Stop Valve
Note! Please avoid contact of any liquid to the compressed textile. Failure to do so will activate
the textile and shut the incoming water. Textile will not work if plaic wrap is not removed.
Please do not re-use Leak Stop pads once activated.
4. Take the plaic wrap o of the Compressed
Textile then place the Textile inside the Leak Stop
Valve as shown above. (You may wish to insert
the Compressed Textile after Syem Startup is
complete in case of early monitored leaks).
INOUT
Flow Closed Position
5. Turn the Stop Switch down and the
Leak Stop Valve is ready.
Red
Tube
White
Tube
INOUT
Flow Open Position
2. Position the Leak Stop Valve on the oor of the same
cabinet (so any leaking water will make contact with the
valve) beside the syem and use the two screws to secure
the Valve to the cabinet oor. (Place Leak Stop Valve in the
lowe possible location beside the RO Syem).
3. Connect one end of the Red Tubing into the Feed Water Adapter Valve and connect the other end
of the Red Tubing into the hole marked “IN” on the Leak Stop Valve. Then connect one end of the
White Tubing into the hole marked “OUT” on the Leak Stop Valve and connect the other end of the
White Tubing into the Male Elbow Fitting attached to the Sediment Filter Housing marked “IN”.
Red TubeWhite Tube
INOUT
1. Position the RO Syem in the
desired permanent location.
Elbow Fitting Inallation
Gauge Inallation
1. Screw a Male Elbow Fitting into the right-
mo Filter Housing (Sediment) marked “IN”.
Screw until tightened and the arm of the Elbow
is facing downward.
2. Secure the White Tubing into the Male Elbow
Fitting. Push hard enough on the tubing to
make sure the Quick Connect has locked
before moving on.
3. Screw the other Male Elbow Fitting (with red
plug) into the leftmo Filter Housing (Carbon
Block) marked “OUT”. Screw until tightened and
the arm of the Elbow is facing upwards at an 11
O’Clock angle (use the above image for reference).
4. Remove the Red Plug. Secure the Red
Tubing into the Male Elbow Fitting. Push hard
enough on the tubing to make sure the Quick
Connect has locked before moving on.
1. Put the end of the Pressure Gauge into one
of the top arms of the Stem Tee. Then, put the
Red Tubing into the opposite end as shown.
Both will go about 5/8ths inch into the tee to
secure.
2. Put the small bottom end of the Stem Tee into
the Male Elbow of the RO Membrane Cap. Use
Blue Locking Clips to secure all 3 connection
points as shown.
NOTE!
Not all RO Syems include a Pressure Gauge. If your syem does include a Gauge we will inall it now.