Use and Care Manual

12
Tubing Quick Connect Guide
To Cut Tubing
Make your cuts again a at cutting surface with a razor blade, or use a handheld tube cutter. Any cuts to
your Tubing mu be perfectly raight.
NOTE!
Improperly cut Tubing may leak water or fail to lock into Fittings.
Wait until all elements of your RO Syem are in their nal locations before cutting your Tubing.
Make sure you measure the length you will need before cutting.
Attach Tubing
Push Tubing in raight and level with the
Collet. The Tubing will go 5/8ths of an inch
into the Collet before the lock is activated.
Pull out on the Tube to make sure the lock
has activated and the Tubing is secure.
NOTE! Once connected, make sure to
check tubing is secure.
5/8”
5/8”
Insert or Remove Locking Clips
To lock a Tube in place make sure the
Tubing is fully inserted then slide the open
end of the Clip between the Collet and
Fitting. The Clip mu be removed before
the Tubing can be removed. To remove
the Clip pull away until it slides out from
between the Collet and Fitting.
Unlocked Locked
The tubing in your RO Syem uses a Quick Connect locking mechanism to
lock the Color Coded Tubing in place. Be careful not to damage your tubing
as you unpack it.
NOTE!
Make sure to remove any plugs before attempting to insert tubing.
Plug
Collet
Locking
Clip
Fitting
Release Tubing/Plugs
If there is a Locking Clip on the Collet it mu
be removed before the Tubing can be released.
Push and hold the Collet in to release the lock
while pulling out on the Tube/Plugs.
NOTE! Collet mu be held down while
pulling up on the tube to release the tube.
Hold
Down
Pull
Up