Installation Guide
10
After shutting o the main water line open all of your home plumbing xtures to drain as much water
as possible and reduce pressure in your plumbing.
Prepare Your Inall Site
Your inall location should be at any point after the main water supply line enters your home, but
before the line splits or meets the hot water heater. If your line branches o to outdoor and indoor
plumbing you may wish to inall on the indoor line if you would only like to lter your indoor water.
Measure the amount of line you will need to remove at your inall location.
You will need enough space for the syem, and any adapters, shut-o valves, bypass valves, or other
ttings you may need.
Prepare for the line to discharge water once cut. Allow the line to drain before proceeding. Make sure
the end of the line is smooth with no jagged edges after cutting.
You can mount the syem to the wall at your inall location, or it can and on its frame on the oor.
If you are mounting the syem o the oor make sure the wall can support the weight of the syem
when full of water.
Inallation