Installation Guide
INSTALLATION STEPS
STEP ONE Install the starter strip at the lowest point of the structure. The structure’s solid substrate
must be no less than 7/16” thick. The end of the starter strip should be positioned flush with the wall
corner. Nail the starter strip every 12”. Make sure the starter strip remains level.
Figure 1
STEP TWO If using vinyl corner posts, install the post prior to installing any panels. When using the
Creek Ledgestone molded corner, install a starter clip, open end UP (figure 2) and place it just above the
starter strip so that the bottom of the starter clip rest on the top of the starter strip nailing flange.
(figure 1). Creek Ledgestone molded corners will be installed after panels from adjacent walls have
been set. (See “Creek Ledgestone Individual Molded Corner Installation” section below).
Figure 2
STEP THREE: It is recommended to determine the number of panels needed for the wall by
measuring the total length of the wall in inches, subtracting the width of the corner pieces used and
dividing by 40.25” (the width of one panel exposed to the weather). As you will need to cut the right
end panel, ensure that it remains at least 12” wide by reducing the size of the starting panel. Be sure
not to overlap the mortar joints of the panel below to ensure a pleasing and authentic stone look. Do
not cut more than one end piece at this time since adjustments will be required for succeeding rows.
STEP FOUR: Working from left to right, slide the first panel left, butting it flush to the vinyl corner or
for use with molded corners, leave a 2 ½” to 3” gap from the corner of the wall to the edge of the
installed panel (figure 3). Set the first panel gently onto the starter strip making sure to properly engage
all installation fingers. Do not override the functioning, positive stop posts that are in-line with the
installation fingers on the back of the panel.
WI-QPC-1019REV- Page | 3 of 7 CREEK LEDGESTONE







